Permit Information
Permit NumberESC14-00381
StatusFinaled
Name ERIC ALLEN
Site Address 3299 E WINDSONG DR
Project Name 
Customer Number 
ePlanReviewNo
Description
general permit for staging area
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection4/1/20154/1/20154/1/2015 PASS
DetailsAndy J. Long
Stockpile area for BH#5 is now the location of grading and utility installed for BH#6 and is covered and inspected under ESC15-00094. No corrections at site required at this time.
DOC - Permit Finaled4/1/20154/1/20154/1/2015PPASS
DetailsAndy J. Long
General Inspection3/16/20153/17/20153/17/2015APASS
DetailsAndy J. Long
WIP on moving stockpile and rocks. Still need to install all BMPs for full operation under ESC15-00094. No sediment runoff or trackout occuring at site. Will check with BMP installation later this week with JH Development.
General Inspection3/16/20153/16/20153/16/2015 CANC
DetailsAndy J. Long
rescheduled
General Inspection2/27/20152/27/20152/27/2015 PASS
DetailsAndy J. Long
No activity currently on stockpile. Plans for new phase in this area were just reviewed and construction should start in March. Stockpile will be moved or used in grading operation.

No sediment runoff, dust, or other issues at stockpile site.
General Inspection2/12/20152/12/20152/12/2015 PASS
DetailsAndy J. Long
Stockpile is currently inactive. A earthen berm blocks access to trespassers and also diverts runoff to stormwater pond.

No trackout or sediment runoff to Windsong, no dust, stockpile is stabile.
General Inspection1/28/20151/28/20151/28/2015 PASS
DetailsAndy J. Long
No changes or activity at BH #5 stockpile in recent weeks. Entrance is barricade No trackout or sediment runoff down Windsong.
General Inspection1/13/20151/13/20151/13/2015 PASS
DetailsEvan Jenkins
General Inspection12/29/201412/29/201412/29/2014 PASS
DetailsAndy J. Long
No changes to BH#5 staging area in recent weeks. Earthen berm blocks a lot of uphill runoff on road and directs it to the existing stormwater retention pond. No corrections.
General Inspection12/11/201412/11/201412/11/2014 PASS
DetailsAndy J. Long
No erosion issues or dust blowing off stockpile at top of Windsong. Home on Birdsong put some stockpiles at end of stabilized rock entrance. This prevents access and creates a berm to stop uphill drainage.

No issues or corrections.
General Inspection11/26/201411/26/201411/26/2014 PASS
DetailsAndy J. Long
No current activity at BH #5 stockpile. An earthen berm has been installed 50 meters up from end of Windsong and divert sheet flow the stormwater drainage pond. The old rock construction entrance is still installed but will need to be replenished when activity increases.

Next week, the SFH on Birdsong Ct. will be using some of the dirt to backfill his site. I alerted him that he will be required to clean up any trackout and restore BMPs
General Inspection11/11/201411/11/201411/12/2014 PEND
DetailsAndy J. Long
Boulder Heights stockpile area is still in use and dirt being added and removed. No current ESC issues or rills developing or sediment leaving site down Windsong, but RP has notified that check dams and stockpile containment should be implemented before more precipitation occurs. RP Eric has agreed and will be addressing over the next few weeks which is okay unless problems arise.
General Inspection10/24/201410/24/201410/24/2014 PASS
DetailsAndy J. Long
Stockpile at top of BH#5 is still in place. No erosion, sediment runoff, or dust issues at time of inspection. Additional barricade has been installed to prevent unauthorized access and trackout as well as more rock placed on construction entrance. No corrections required at this time.
General Inspection10/9/201410/9/201410/9/2014 PASS
DetailsAndy J. Long
No issues currently with access road to stockpile or stockpile itself. Will still need to reinforce the existing check dams at discharge channel to Windsong. RP Eric Allen stated he will have a crew and excavator install the BMPs as we approach the wet season.
General Inspection9/24/20149/24/20149/24/2014 PASS
DetailsAndy J. Long
Stockpile is still in place. No activity. No windblown dust observed and no complaints received. No corrections at this time.
General Inspection9/9/20149/9/20149/9/2014 PASS
DetailsAndy J. Long
No dust issues or sediment leaving staging area or access road. Will need to have J & H Development reinstall check dams before the wet season on Windsong.
General Inspection8/22/20148/22/20148/22/2014 PASS
DetailsEvan Jenkins
large stockpile still in place.
no esc issues at this time
General Inspection8/6/20148/6/20148/6/2014 PASS
DetailsEvan Jenkins
No esc issues at time of inspection
General Inspection7/22/20147/22/20147/22/2014 PASS
DetailsEvan Jenkins
General Inspection6/20/20146/20/20146/20/2014 PASS
DetailsEvan Jenkins
No issues at time of inspection
General Inspection5/30/20145/30/20145/30/2014 PASS
DetailsAndy J. Long
Stockpile has not vegetated or been seeded but does not seem to be generating dust or complaints from residents. Dirt is to be moved to another project off-site according to JH Development.
Site Preparation5/13/20145/13/20145/13/2014PPASS
DetailsAndy J. Long
JH Development obtained ESC general permit for stockpiling activities on this parcel. This satisfies a Correction Notice issued under Boulder Heights #5 permit ESC13-00344.

Stockpile has not been tacified, but no dust issues observed at time of inspection.