Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberESC14-00388
StatusFinaled
Name JESSE GEARY
Site Address 350 N MILWAUKEE ST
Project NameBoise Towne Square Mall
Customer Number 
ePlanReviewNo
Description
Boise Towne Square Mall - Pavement Rehab 2014. Replace existing pavement and stormwater infrastructure in multiple areas surrounding the mall. Discharge is to infiltration swales throughout the site. BMPs include dust control of unstabilized areas, lined concrete washout, inlet protection, and sweeping of track out that occurs. Pre-con/site prep required and also listed ESC plan. Low Erosivity Waiver (LEW) filed instead of CGP.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled7/22/20147/22/20147/22/2014PPASS
DetailsAndy J. Long
RP called back to confirm project is complete and the DI bags will be collected at the end of the week.

ESC conditions satisfed.
Site Final7/21/20147/21/20147/21/2014PPART
DetailsAndy J. Long
Work is complete. The DI bags installed need to be removed to allow for proper drainage.
Site Preparation6/10/20146/10/20146/10/2014PPASS
DetailsAndy J. Long
Jesse Phone #: ###-####

Work includes updating accessibility ramps at Macy's entrance's and some parking lot repair. DI bags have been placed in stormwater drains with project area. Housekeeping will be main BMP. Low risk for sediment migration off site..
Site Preparation6/4/20146/9/20146/9/2014APART
DetailsAndy J. Long
Jesse Phone #: ###-####

Called RP and did not get response. Inspected site and it does not appear they have set up their staging area. Some DIs have existing filter fabric protection.

Called B&H Paving (different parking lot repair project) Kelly # ###-#### about a leaky front loader tractor parked nearby storm drain. He said it will be moved asap and floor dry/absorbent material placed on oil/fluid spill.
General Inspection6/4/20146/4/20146/4/2014 NR
DetailsEvan Jenkins
Construction has not begun. Contacted RP Jesse, he stated they will be starting next week and will call in a site prep inspection