Permit Information
Permit NumberESC14-00392
StatusFinaled
Name BRIAN MURPHY
Site Address 3201 W AIRPORT WAY
Project NameLot 20 and Lot 30 Modification
Customer Number 
ePlanReviewNo
Description
The Boise Air Terminal Parking Lot 20 and Lot 30 Modifications has been divided into two separate bid schedules as outlined below.

BID SCHEDULE NO 1:
PARKING LOT 30 MODIFICATION WORK INCLUDES, BUT IS NOT LIMITED TO:
·RECONFIGURATION AND RE-STRIPING OF THE PARKING LOT FOR EMPLOYEE AND LONG TERM PUBLIC PARKING. WORK WILL INCLUDE ASPHALT REPAIR, ASPHALT SEAL COAT, CONCRETE CURB ISLAND, GATE ARM LOOP DETECTORS, NEW SIGNAGE, AND NEW SITE LIGHTING.
·RE-ALIGNMENT OF THE ENTRANCE AND EXIT ALONG THE EAST AIRPORT ROADWAY.
·INSTALLATION OF NEW LANDSCAPING TO MATCH OTHER RECENT LANDSCAPING UPGRADES AROUND THE AIRPORT TERMINAL BUILDING.
·INSTALLATION OF NEW PARKING SPACES FOR LONG-TERM PUBLIC PARKING IN THE AREA OF THE EXISTING FEDERAL AVIATION ADMINISTRATION (FAA) AIR TRAFFIC CONTROL TOWER. DEMOLITION AND REMOVAL OF THE AIR TRAFFIC CONTROL TOWER WILL BE BY OTHERS AT A LATER DATE AND IS NOT INCLUDED IN THIS SCOPE OF WORK.

BID SCHEDULE NO 2:
PARKING LOT 20 MODIFICATION WORK INCLUDES, BUT IS NOT LIMITED TO:
·RECONFIGURATION OF RENTAL CAR DRIVEWAY ENTRY AND EXIT INCLUDING A NEW CONCRETE CURB ISLAND AND STRIPING.
·RECONFIGURATION AND RE-STRIPING OF THE PARKING LOT. WORK WILL INCLUDE LIMITED ASPHALT REPAIR, NEW ASPHALT SEAL COAT, AND ACCESSIBLE SIGNAGE.
·RELOCATION OF TWO EXISTING DOUBLE-BAY RENTAL CAR ROOF CANOPIES AND INSTALLATION OF ONE NEW SINGLE-BAY RENTAL CAR ROOF CANOPY.
·INSTALLATION OF THREE NEW DOUBLE-BAY RENTAL CAR ROOF CANOPIES AND GATE ARM WITH LOOP DETECTORS.
·INSTALLATION OF ONE NEW PEDESTRIAN ENTRY CANOPY ABOVE THE EXISTING WEST STAIR TOWER EXIT OF THE AIRPORT TERMINAL BUILDING. (NOTE: Per Tim Woodard, the Entry Canopy at the Terminal Building will be permitted with a separate Building Permit. Refer to the separate Building Permit application that has been included as part of this Plan Review and Building Permit Application. All of the required drawings and documents are included as part of this submittal).
·RELOCATION OF A CHAIN-LINK FENCE AND EQUIPMENT ACCESS GATE SOUTH OF THE RENTAL CAR CANOPY LOT.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/12/201412/12/201412/12/2014 PASS
DetailsAndy J. Long
Construction complete. Both parking lots are finished including landscaping, drainage system, and curbing. No disturbed area or loose sediment. ESC permit conditions satisfied.
DOC - Permit Finaled12/12/201412/12/201412/12/2014PPASS
DetailsAndy J. Long
General Inspection10/27/201410/27/201410/27/2014 PASS
DetailsAndy J. Long
Airport parking lot resurfacing and perimeter landscaping project is still underway. No trackout onto Airport Way; no loose stockpiles; parking areas that have been paved have been swept to remove loose sediment. No corrections required.
General Inspection9/9/20149/9/20149/9/2014 PASS
DetailsAndy J. Long
Old parking lot near east airport exit drive has been removed and is being prepped for grading and repaving. No signficant trackout or dust issues. Work area surrounds the old tower demolition project as well. Perimeter wattles installed sheet flow drainage points.

No corrections required at this time.