General Inspection | 4/15/2015 | 4/15/2015 | 4/15/2015 | | PASS |
Andy J. Long
|
|
|
DI bag removed on inlet from Pleasant Hill. Onsite ESC issues addressed. Permit conditions satisfied. Home occupied and stabilized.
|
DOC - Permit Finaled | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/31/2015 | 3/31/2015 | 3/31/2015 | | PASS |
Andy J. Long
|
|
|
Rill erosion on perimeter banks from lawn irrigation has been raked out/graded and hydoseeded in addition to the shoulders of the driveway.
Just need to remove DI bag on Pleasant Hill and site will be ready to final.
|
General Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | | PEND |
Andy J. Long
|
|
|
Trackout and sediment accumulation on Pleasant Hill has been cleaned. Driveway is now paved and the driveway shoulders have been hydroseeded. Project is near completion.
Irrigation of recently installed sod has created some rill erosion on interior banks that will need to be fixed to pass site final and DI bag on Pleasant Hill removed.
|
General Inspection | 2/27/2015 | 2/27/2015 | 2/27/2015 | | FAIL |
Andy J. Long
|
|
|
Significant amount of sediment and sand has accumulated on street and gutter from unpaved driveway with no stabilized construction entrance
Corrections:
Sweep up street, sidewalk and gutter that is downhill from site. Should be cleaned over the weekend.
2nd failed inspection/warning
|
General Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 | | FAIL |
Evan Jenkins
|
|
|
Excessive trackout from site, going down Clubview. Contacted RP Chad and left VM disclosing the violation. told him to sweep up excessive trackout, and limit the amount of vehicle traffic entering and exiting Pleasant Hill Way
|
Random Inspection | 2/12/2015 | 2/12/2015 | 2/12/2015 | P | CANC |
Evan Jenkins
|
|
|
Excessive Trackout Data Entry Error: Didn't realize already have a general inspection for this site
|
General Inspection | 1/28/2015 | 1/28/2015 | 1/28/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No corrections needed.
|
General Inspection | 1/13/2015 | 1/13/2015 | 1/13/2015 | | PART |
Andy J. Long
|
|
|
Some sandy trackout to street and sidewalk from site is occuring. There is alot of sand on street from ACHD winter driving safety applications, so just need to sweep driveway apron and sidewalk. No other violations. Vegetated buffer on slopes has remained intact.
|
General Inspection | 12/29/2014 | 12/29/2014 | 12/29/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No hillside erosion issues observed. There is a significant amount of sand from winter road safety activity - no trackout coming from site. Work ongoing on the interior.
|
General Inspection | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
General Inspection | 11/26/2014 | 11/26/2014 | 12/1/2014 | | PASS |
Evan Jenkins
|
|
|
Interior work only at time of ispection. Disturbed areas need final stabilization practices applied. no real esc issues at this time
|
General Inspection | 11/11/2014 | 11/11/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
House frame is up. No construction activity at time of inspection. No trackout to Pleasant Hill or other BMP violations observed. Approved.
|
General Inspection | 10/24/2014 | 10/24/2014 | 10/24/2014 | | PASS |
Andy J. Long
|
|
|
No trackout, sediment runoff or other violations. WIP. No corrections
|
General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | | PASS |
Evan Jenkins
|
|
|
|
Random Inspection | 8/25/2014 | 8/25/2014 | 8/25/2014 | P | PART |
Andy J. Long
|
|
|
No major ESC issues, but observed stockpile from a utility/sewer trench that is adjacent to sidewalk and unprotected. Advised RP/GC Chad Crocker to install containment BMP around stockpile or complete the backfill. He agreed to install wattle or move stockpile away from road.
|
General Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | | PASS |
Evan Jenkins
|
|
|
|
Site Preparation | 5/29/2014 | 5/30/2014 | 5/30/2014 | A | PASS |
Evan Jenkins
|
|
|
Chad Phone #: ###-####
|