Site Final | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Andy J. Long
|
|
|
Miles Phone #: ###-####
ESC permit conditions satisfied. Tennis courts installed and surrounding work (landscaping & parking) is also complete. No loose sediment or left over materials/trash. Permit finaled.
|
DOC - Permit Finaled | 10/29/2014 | 10/29/2014 | 10/29/2014 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/27/2014 | 10/27/2014 | 10/27/2014 | | PASS |
Andy J. Long
|
|
|
Construction on new tennis courts at Ann Morrison is complete. Parking lot and curb work is installed and no loose sediment. Landscaping/stabilization with sod and bark. ESC conditions satisfied.
|
General Inspection | 10/10/2014 | 10/10/2014 | 10/10/2014 | | PASS |
Andy J. Long
|
|
|
New surface has been applied to Ann Morrison tennis courts. Surrounding area is landscaped/stabilized.
|
General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | | PASS |
Andy J. Long
|
|
|
Still preparing to put tennis court surface on the pavement that is already in place. Surrounding areas have been stabilized/landscaped. No violations observed.
|
General Inspection | 9/10/2014 | 9/10/2014 | 9/10/2014 | | PASS |
Andy J. Long
|
|
|
Project is near completion with area surrounding the tennis courts been stabilized with sod and curbing/sidewalk structures. Still need to apply the tennis court surface material.
No violations observed.
|
General Inspection | 8/6/2014 | 8/6/2014 | 8/6/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/22/2014 | 7/22/2014 | 7/22/2014 | | PASS |
Evan Jenkins
|
|
|
Construction signage posted on fence. Concrete washout located onsite no esc issues at time of inspection
|
General Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/4/2014 | 6/4/2014 | 6/4/2014 | | PASS |
Evan Jenkins
|
|
|
|