DOC - Permit Finaled | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Andy J. Long
|
|
|
House complete, landscaped, and occupied. All permits finaled.
|
Random Inspection | 6/3/2014 | 6/3/2014 | 6/3/2014 | P | FAIL |
Andy J. Long
|
|
|
Stockpile of dirt dumped on side walk and extending into the street. Work appears to be in progress but no workers on site at time of inspection.
Verbal warning issued to RP Adam of Eaglewood Homes to have stockpile removed from street & sidewalk and swept ASAP. He agreed and said it would get done and the crew should be back on site shortly.
|
Site Preparation | 5/27/2014 | 5/28/2014 | 5/28/2014 | A | PASS |
Andy J. Long
|
|
|
Adam Phone #: ###-####
Permit posted. Neighborhood BMPs (DI protection and washout) are provided. Streets recently swept.
Construction will begin this afternoon. Met RP Adam to discuss this site and other projects in Sunny Ridge.
|