Site Final | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/25/2015 | 3/25/2015 | 3/25/2015 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/13/2015 | 3/13/2015 | 3/13/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or sediment leaving site. Sole loose sediment is with parking lot area due to ongoing landscaping. Storm drains have inlet protection. Permit posted on trailer. Clean job site overall. No corrections.
|
General Inspection | 1/26/2015 | 1/26/2015 | 1/26/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Some loose dirt/sediment within the already paved parking lot but the new onsite stormdrains have sediment filter bags installed. Workers parking on hard surfaces, staying off mud. No trackout or discharges from site.
Approved.
|
Random Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 | A | PASS |
Andy J. Long
|
|
|
St. Al's Joint Preservation building (south of Emerald) is in progress.
Permit posted, designated concrete washout and material storage area, new storm drains have DI protection, and workers are parking on hard surfaces to limit trackout.
Some sand and dirt in the access road should be swept but not trackout or discharges offsite are occuring. Approved.
|
General Inspection | 10/31/2014 | 10/31/2014 | 10/31/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Andy J. Long
|
|
|
WIP. Construction entrance and DI protection is installed. No trackfout or nonstormwater discharges from site. Permit is posted. Approved.
|
Site Preparation | 8/15/2014 | 8/15/2014 | 8/15/2014 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 8/13/2014 | 8/13/2014 | 8/13/2014 | | PART |
Andy J. Long
|
|
|
Work started without ESC site prep inspection.
BMPs currently installed are construction entrance, inlet protect, concrete washout container, and permit is posted.
No violations observed.
|