Aging Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | | PASS |
Andy J. Long
|
|
|
39th Street Village is complete with all SFH construction finished and stabilized. Temporary BMPs have been removed and site has been cleaned. ESC permit conditions satisfied. Permit finaled.
|
DOC - Permit Finaled | 6/22/2015 | 6/22/2015 | 6/22/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/22/2015 | 4/24/2015 | 4/24/2015 | P | PASS |
Andy J. Long
|
|
|
39th Street Village is near full completion. 2 lots are not yet stabilized. No trackout or turbid discharges.
Hayden Homes or McMaster will need to conduct a final sweeping along 39th before ESC final.
No corrective actions needed at this time.
|
Aging Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled for Friday 4-24
|
General Inspection | 2/20/2015 | 2/23/2015 | 2/23/2015 | A | PART |
Evan Jenkins
|
|
|
Minor tracking has occured. Contractor to sweep sidewalks and streets at end of day. will follow up tomorrow 2-24-15
|
General Inspection | 2/16/2015 | 2/16/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Aging Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 | | PASS |
Evan Jenkins
|
|
|
WIP: 3 SFH's currently being constructed. No ESC issues at this time
|
General Inspection | 10/15/2014 | 10/15/2014 | 10/15/2014 | | PASS |
Evan Jenkins
|
|
|
No Activity since last inspection no esc issues
|
General Inspection | 8/14/2014 | 8/14/2014 | 8/14/2014 | | PASS |
Evan Jenkins
|
|
|
Sidewalks and Road installed Permit posted at entrance no esc issues at this time
|