Site Final | 11/20/2015 | 11/20/2015 | 11/20/2015 | P | PASS |
Andy J. Long
|
|
|
Home construction complete. Yard is landscaped and stabilized, silt fence BMP has been removed.
No further ESC inspections needed. Adjacent project by Jayo is in progress. BLD is open. ESC finaled.
|
General Inspection | 11/16/2015 | 11/16/2015 | 11/16/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/30/2015 | 10/30/2015 | 10/30/2015 | | PASS |
Andy J. Long
|
|
|
Home near completion. Yard is now landscaped. Some acivity still occuring, will check for final next inspection.
|
Site Preparation | 10/15/2015 | 10/15/2015 | 10/15/2015 | A | PASS |
Eric Story
|
|
|
|
General Inspection | 10/2/2015 | 10/2/2015 | 10/2/2015 | | PASS |
Andy J. Long
|
|
|
SFH in progress. Frame is complete, interior work ongoing. No sediment or discharges leaving site.
|
General Inspection | 9/17/2015 | 9/17/2015 | 9/17/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 9/2/2015 | 9/2/2015 | 9/2/2015 | | PASS |
Evan Jenkins
|
|
|
No Issues observed at this time
|
General Inspection | 8/18/2015 | 8/18/2015 | 8/19/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior. Yard not landscaped but perimter controls are installed. Site is clean, no sediment leaving site. Trash and materials are contained.
|
General Inspection | 8/3/2015 | 8/3/2015 | 8/3/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Near completion. No ESC violations observed.
|
General Inspection | 7/17/2015 | 7/17/2015 | 7/17/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no ESC issues at this time
|
General Inspection | 7/2/2015 | 7/2/2015 | 7/2/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Frame is complete. Not yet landscaped and currently inactive. Back hillside vegetation has been preserved. No erosion issues or sediment trackout occuring.
|
General Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/2/2015 | 6/2/2015 | 6/2/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/18/2015 | 5/18/2015 | 5/18/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/1/2015 | 5/1/2015 | 5/1/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/16/2015 | 4/16/2015 | 4/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/1/2015 | 4/1/2015 | 4/1/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: currently interior and exterior work being performed. Permit still posted. No offsite discharges leaving the construction site. no ESC issues at time of inspection
|
General Inspection | 3/17/2015 | 3/17/2015 | 3/17/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: no issues at this time
|
General Inspection | 3/2/2015 | 3/2/2015 | 3/2/2015 | | PASS |
Evan Jenkins
|
|
|
no ESC issues at time of inspection
|
General Inspection | 2/13/2015 | 2/13/2015 | 2/13/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/23/2015 | 1/23/2015 | 1/23/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Silt fence installed on back slope (behind house) and wattle along perimeter/edge of pavement. Permit posted. No violations.
|
General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Contractors parking on street to prevent trackout. Perimeter wattles installed along front and back. Permit posted.
|
General Inspection | 12/23/2014 | 12/23/2014 | 12/23/2014 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 12/8/2014 | 12/8/2014 | 12/8/2014 | A | PASS |
Andy J. Long
|
|
|
Permit posted. BMPs installed included stabilized rock construction access and perimeter straw wattles trenched in on the 3 downslope side of site. Site was pre-graded to be flat during sub development. Surrounding vegetation to be preserved. Storm drains and gutters have sediment capture BMPs installed.
Approved.
|