Permit Information
Permit NumberESC14-00488
StatusFinaled
Name SHANE JAYO
Site Address 655 E ORION DR
Project Name 
Customer Number 
ePlanReviewNo
Description
As per ESC conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/20/201511/20/201511/20/2015PPASS
DetailsAndy J. Long
Home construction complete. Yard is landscaped and stabilized, silt fence BMP has been removed.

No further ESC inspections needed. Adjacent project by Jayo is in progress. BLD is open. ESC finaled.
General Inspection11/16/201511/16/201511/16/2015 PASS
DetailsAndy J. Long
General Inspection10/30/201510/30/201510/30/2015 PASS
DetailsAndy J. Long
Home near completion. Yard is now landscaped. Some acivity still occuring, will check for final next inspection.
Site Preparation10/15/201510/15/201510/15/2015APASS
DetailsEric Story
General Inspection10/2/201510/2/201510/2/2015 PASS
DetailsAndy J. Long
SFH in progress. Frame is complete, interior work ongoing. No sediment or discharges leaving site.
General Inspection9/17/20159/17/20159/17/2015 PASS
DetailsEvan Jenkins
General Inspection9/2/20159/2/20159/2/2015 PASS
DetailsEvan Jenkins
No Issues observed at this time
General Inspection8/18/20158/18/20158/19/2015 PASS
DetailsAndy J. Long
WIP on interior. Yard not landscaped but perimter controls are installed. Site is clean, no sediment leaving site. Trash and materials are contained.
General Inspection8/3/20158/3/20158/3/2015 PASS
DetailsAndy J. Long
WIP. Near completion. No ESC violations observed.
General Inspection7/17/20157/17/20157/17/2015 PASS
DetailsEvan Jenkins
WIP: no ESC issues at this time
General Inspection7/2/20157/2/20157/2/2015 PASS
DetailsAndy J. Long
WIP. Frame is complete. Not yet landscaped and currently inactive. Back hillside vegetation has been preserved. No erosion issues or sediment trackout occuring.
General Inspection6/17/20156/17/20156/17/2015 PASS
DetailsEvan Jenkins
General Inspection6/2/20156/2/20156/2/2015 PASS
DetailsEvan Jenkins
General Inspection5/18/20155/18/20155/18/2015 CANC
DetailsAndy J. Long
General Inspection5/1/20155/1/20155/1/2015 PASS
DetailsAndy J. Long
General Inspection4/16/20154/16/20154/16/2015 PASS
DetailsEvan Jenkins
General Inspection4/1/20154/1/20154/1/2015 PASS
DetailsEvan Jenkins
WIP: currently interior and exterior work being performed. Permit still posted. No offsite discharges leaving the construction site. no ESC issues at time of inspection
General Inspection3/17/20153/17/20153/17/2015 PASS
DetailsEvan Jenkins
WIP:
no issues at this time
General Inspection3/2/20153/2/20153/2/2015 PASS
DetailsEvan Jenkins
no ESC issues at time of inspection
General Inspection2/13/20152/13/20152/13/2015 PASS
DetailsEvan Jenkins
General Inspection1/23/20151/23/20151/23/2015 PASS
DetailsAndy J. Long
WIP. Silt fence installed on back slope (behind house) and wattle along perimeter/edge of pavement. Permit posted. No violations.
General Inspection1/8/20151/8/20151/8/2015 PASS
DetailsAndy J. Long
WIP. Contractors parking on street to prevent trackout. Perimeter wattles installed along front and back. Permit posted.
General Inspection12/23/201412/23/201412/23/2014 PASS
DetailsAndy J. Long
Site Preparation12/8/201412/8/201412/8/2014APASS
DetailsAndy J. Long
Permit posted. BMPs installed included stabilized rock construction access and perimeter straw wattles trenched in on the 3 downslope side of site. Site was pre-graded to be flat during sub development. Surrounding vegetation to be preserved. Storm drains and gutters have sediment capture BMPs installed.

Approved.