DOC - Permit Finaled | 2/2/2015 | 2/2/2015 | 2/2/2015 | P | PASS |
Andy J. Long
|
|
|
New parking lot has been installed at Campbell Company and has onsite stormwater drainage. No further ESC inspections for this permit, remaining construction activity will be inspected on ESC14-00514
|
General Inspection | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on Campell Co. No trackout to McGregor, no discharges. Permits posted. Limited activity at time of inspection.
|
General Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection. No trackout or sediment leaving site boundary, however interior parking and access way does have some mud and loose sediment. Stormwater facilities have protection.
Permit posted, BMPs installed. No corrections at this time. No
|
General Inspection | 10/16/2014 | 10/16/2014 | 10/16/2014 | A | PASS |
Andy J. Long
|
|
|
Swale at Campbell Co. has been removed and site is prepped for underground seepage. No sediment in gutter next to disturbance, permit posted, and MS4 has DI sediment sacks
|
Complaint Inspection | 9/12/2014 | 9/12/2014 | 9/12/2014 | P | PASS |
Andy J. Long
|
|
|
investigate report that work is occuring with no site prep?
2 BLD projects are occuring at Campbell Company with two ESC permits issued. Site prep inspection was conducted under ESC14-00514 on 8/28/2014.
Permit posted, BMPs installed, no violations observed.
|