General Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | | PASS |
Andy J. Long
|
|
|
Home is now landscaped and stabilized with drainage system connected to control rooftop runoff.
Home occupied. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/13/2015 | 2/13/2015 | 2/13/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/26/2015 | 1/26/2015 | 1/26/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/9/2015 | 1/9/2015 | 1/9/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/19/2014 | 12/19/2014 | 12/19/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Getting ready to pour driveway, no sediment leaving site and no trackout in Somerset Village. BMPs installed.
Need to use a lined washout with remaining capacity, the other day the old upper washout was used and it spilled over. See ESC13-00193 for details on Corrections.
|
General Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/14/2014 | 11/14/2014 | 11/14/2014 | | CANC |
Evan Jenkins
|
|
|
due to dangerious snow conditions/road ways, unable to make it to the inspection
|
General Inspection | 10/30/2014 | 10/30/2014 | 10/30/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Somerset village/Jayo projects are in good conditions. Perimeter wattles are being kept in place, trash contained, and contractors parking on the street to prevent trackout. No violations.
|
General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | | FAIL |
Evan Jenkins
|
|
|
Site Prep Inspection was Required, but not called in by RP. RP has been reminded several times about the Site Prep Inspection Requirement. For future projects under this RP, if Site Prep Inspection is not called in prior to earth disturbance, automatic SWO will be issued until a Site Prep Inspection is Requested.
|