General Inspection | 2/16/2015 | 2/16/2015 | 2/20/2015 | | PASS |
Andy J. Long
|
|
|
4 plex complete. All permits finaled.
|
DOC - Permit Finaled | 2/20/2015 | 2/20/2015 | 2/20/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | PASS |
Andy J. Long
|
|
|
4-plex is still in progress at Aberdeen. Trash and building materials contained, no exposed chemical storage, and no windblown trash. Drop inlets have sediment protection. Approved.
|
General Inspection | 11/11/2014 | 11/11/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
Aberdeen 4-plex is in progress. No corrections at this time. Trash and sediment are contained. Approved.
|
General Inspection | 9/25/2014 | 9/25/2014 | 9/25/2014 | | PASS |
Andy J. Long
|
|
|
|