General Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Andy J. Long
|
|
|
Drop inlet bag on MS4 on McGregor to the east of Campbell Co. has been removed as requested.
Bag to the west on McGregor will be removed when the adjacent project (ESC14-01030) is complete.
ESC permit conditions satisfied; permit finaled.
|
DOC - Permit Finaled | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/20/2015 | 3/20/2015 | 3/20/2015 | | PART |
Andy J. Long
|
|
|
Construction complete and site has been landscaped and hard surfaces swept. Silt fence BMP has been removed and vegetation/sage brush was preserved on the hillside.
1 correction: Remove DI filter bags (2) on McGregor when removing EKC sign. Both bags are still in good condition.
|
General Inspection | 2/2/2015 | 2/2/2015 | 2/2/2015 | | PASS |
Andy J. Long
|
|
|
WIP on new building for Campell Co. No trackout offsite to McGregor. MS4 DIs have protection, silt fence perimeter is still install along back of building. No violations observations.
|
Complaint Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 | P | PART |
Andy J. Long
|
|
|
excecessive trackout reported by Public Works environmental technician
Inspection found that trackout is located within interior parking access drive (private). No trackout to McGregor or accumulations in MS4 gutters.
Parking lot still should be swept this week to prevent further trackout offsite. Project manager Josh stated that curbing crews would sweep this week after finishing work. Onsite storm drain has sediment bag installed.
No other violations observed.
|
General Inspection | 12/4/2014 | 12/4/2014 | 12/4/2014 | | PASS |
Andy J. Long
|
|
|
WIP at Campbell Co. See also ESC14-00499 for associated project. No trackout. DIs have filter protection. Permits post. Silt fence along hilltop is installed. No corrections.
|
General Inspection | 10/16/2014 | 10/16/2014 | 10/16/2014 | | PASS |
Andy J. Long
|
|
|
WIP at Campbell Company. Silt fence at edge of hill/project boudary is staked and vegetation downslope is undisturbed. Permit posted. No trackout to Mcgregor and MS4 stormdrains have sediment protection.
Some trackout within the parking lot due to trenching. Currently not leaving site or affecting drainage facilities.
|
Site Preparation | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Andy J. Long
|
|
|
Josh Phone #: ###-####
Site walk through with project supervisor from EKC construction. All BMPs set up per ESC site plan, with one change to additional silt fence with wattle to the south of site. Permit posted and SWPPP is onsite. Approved.
|