Site Final | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Andy J. Long
|
|
|
Bank next to driveway has been stabilized with sod and mulch. A small check dam has been built to capture sediment running towards Greenbelt. No further requests. ESC permit conditions satisfied.
|
DOC - Permit Finaled | 5/5/2015 | 5/5/2015 | 5/5/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 4/17/2015 | 4/17/2015 | 4/17/2015 | P | PEND |
Andy J. Long
|
|
|
Discussed bank stabilization with RP-GC Al. Bank will be sodded and covered with bark mulch. May need to reinforce toe of slope is dirt is undercut.
Landscaping scheduled to be complete next week.
|
Complaint Inspection | 3/26/2015 | 3/26/2015 | 3/26/2015 | P | PART |
Andy J. Long
|
|
|
Citizen complaint about dirt running down road to Greenbelt path.
Need to sweep up loose dirt and stabilize driveway. Request issued to workers onsite to sweep this afternoon.
|
Aging Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PART |
Andy J. Long
|
|
|
WIP. Driveway is muddy but no significant trackout or evidence of muddy discharges offsite.
Need to post permit and stay off driveway while it is muddy to avoid trackout.
|
Aging Inspection | 12/5/2014 | 12/5/2014 | 12/5/2014 | | PASS |
Andy J. Long
|
|
|
Detached garages near completion. No sediment leaving site.
|