Site Final | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/17/2015 | 6/17/2015 | 6/17/2015 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 3/11/2015 | 3/12/2015 | 3/12/2015 | A | PASS |
Evan Jenkins
|
|
|
Permit posted grade is well below ROW, so its unlikely any discharge will take place. Concrete washout was ordered and will be onsite next week.
|
Site Preparation | 3/11/2015 | 3/11/2015 | 3/11/2015 | P | FAIL |
Evan Jenkins
|
|
|
Dan Phone #: ###-#### Permit Not Posted BMP's not installed Attempted to call RP Dan and left VM to meet me, haven't heard back
|