Aging Inspection | 12/11/2014 | 12/11/2014 | 12/11/2014 | | PASS |
Andy J. Long
|
|
|
WIP at new Maverik. Store building, gas pumps and canopy, and parking lot paving has been completed.
No significant trackout or discharges from site observed. In pretty good condition overall.
2 corrections: 1. Conduct manual sweep up of sidewalks and gutters to remove loose sediment from previous trackout and parking lot prep work. 2. Protect large stockpile near entrance to prevent dirty stormwater runoff at the site.
Called RP and gave verbal correction notice and to be completed by tomorrow AM.
|
DOC - Permit Finaled | 12/11/2014 | 12/11/2014 | 12/11/2014 | P | PASS |
Andy J. Long
|
|
|
|