Site Final | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PART |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
Project complete. No loose dirt or disturbed area. Need to remove DI bag that was installed in front of site. Notified Syman Co. who was contracted for SWPPP.
|
General Inspection | 5/29/2015 | 5/29/2015 | 5/29/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/13/2015 | 4/13/2015 | 4/13/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse construction in progress. DI bags installed on Federal Way. No trackout or other ESC issues at Ore-Pace site. Work is within paved storage & distribution yard.
|
General Inspection | 2/24/2015 | 2/24/2015 | 2/24/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No exposed soils , site is surrounded by pavement with private drainage. No trackout or other issues. Frame for warehouse is up.
|
General Inspection | 1/9/2015 | 1/9/2015 | 1/9/2015 | | PASS |
Andy J. Long
|
|
|
WIP at rear of OrePac facility, no trackout to Federal Way. Stormwater runoff is retained onsite. No corrections needed.
|
General Inspection | 11/20/2014 | 11/20/2014 | 11/20/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No ESC corrections needed onsite. Limited earthwork with contained paved shipping yard. No trackout to Federal Way or erosion. Two projects ongoing at Ore-Pac, see also ESC14-00451.
|
General Inspection | 10/2/2014 | 10/2/2014 | 10/2/2014 | | PASS |
Andy J. Long
|
|
|
No activity at time of inspection but Ore-Pac project is still in progress. DI on Federal Way is protected. SWPPP and permit are posted. Approved.
|