DOC - Permit Finaled | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 12/29/2014 | 12/29/2014 | 12/29/2014 | P | PASS |
Andy J. Long
|
|
|
Work is complete. Final stabilization is complete. Will remove bmp''s upon final inspection. Phone #: ###-#### Inspection requested via web by Jerald Taylor
Credit union building complete, landscaping and parking lot paving & curbing are installed. Disturbed areas stabilized. Parking lot storm drains have had the inlet protection removed.
ESC conditions satisfied; permit finaled.
|
General Inspection | 12/5/2014 | 12/5/2014 | 12/5/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 10/2/2014 | 10/2/2014 | 10/2/2014 | | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 7/24/2014 | 7/24/2014 | 7/24/2014 | P | PASS |
Andy J. Long
|
|
|
Site has already been rough graded under ESC14-00425 and some minor work has begun for the new credit union building. Site is fenced off, flat, no dewatering. Permit is onsite.
Approved.
|