General Inspection | 3/18/2015 | 3/18/2015 | 3/18/2015 | | PASS |
Andy J. Long
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | PASS |
Andy J. Long
|
|
|
Yard graded/prepped for landscaping to be completed by homeowner. Temp BMPs utilized for project do not need to be removed due to ongoing work at Somerset Village. No further inspections required for this permit. No issues or sediment runoff.
|
General Inspection | 3/3/2015 | 3/3/2015 | 3/3/2015 | | PASS |
Andy J. Long
|
|
|
Construction near completion, no further earth work. Yard still not landscaped and some finishing touches and clean up remain. No trackout or sediment runoff issues, yard is below grade of paved curb so is contained.
|
General Inspection | 2/13/2015 | 2/13/2015 | 2/13/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Evan Jenkins
|
|
|
same comments as prior inspection
|
General Inspection | 1/14/2015 | 1/14/2015 | 1/14/2015 | | PASS |
Evan Jenkins
|
|
|
waiting for establishment of perminant stabilization/vegetation prior to closing permit
|
General Inspection | 12/22/2014 | 12/22/2014 | 12/22/2014 | | PART |
Andy J. Long
|
|
|
Home construction complete and is occupied. Landscaping and stabilization not yet complete. Some site clean up and material removal aslo remains. Not yet ready for site final.
There is a stormwater drainaige issue on the back of house and some sediment is being transported to the neighbors yard and patio.
Needs to be fixed; settled between homeowners/home builder.
|
General Inspection | 12/5/2014 | 12/5/2014 | 12/5/2014 | | PASS |
Andy J. Long
|
|
|
Interior work in progress. No violations observed. Trash is contained, no trackout or discharges.
|
General Inspection | 11/6/2014 | 11/6/2014 | 11/6/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout or sediment runoff at homesite. Somerset Village BMPs are installed and currently in good condition.
|
General Inspection | 10/9/2014 | 10/9/2014 | 10/9/2014 | | PASS |
Andy J. Long
|
|
|
WIP. Permit posted, trash and building materials are contained. Street and gutters in Somerset Village look good and there is multiple SFH projects occuring. No corrections required.
|
Site Preparation | 7/31/2014 | 8/1/2014 | 8/1/2014 | A | PART |
Evan Jenkins
|
|
|
Earth Work already been performed, and foundation already poured. Attempted to contact Shane, but got his vm
|