DOC - Permit Finaled | 1/27/2015 | 1/27/2015 | 1/27/2015 | P | PASS |
Andy J. Long
|
|
|
Aberdeen 4-plex is complete and surrounding area landscaped with parking lot swept last Friday. Exterior painting is currently being completed. ESC permit conditions satisfied, many other open permits and ongoing work at Aberdeen Square.
|
General Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/9/2014 | 12/9/2014 | 12/9/2014 | | PART |
Andy J. Long
|
|
|
Some trackout and mud is being tracked onto sidewalk and gutter. Landscaping crew is onsite working in this area.
Loose sediment and mud needs to be cleaned when the sod, trees, and shrubs are installed.
Rest of Aberdeen Square is in good condition.
|
General Inspection | 10/16/2014 | 10/16/2014 | 10/17/2014 | | PART |
Andy J. Long
|
|
|
Aberdeen 4-plex WIP. No major trackout to surrounding streets, concrete work is currently on hold and old washout is drying out. Storm drains have inlet protection, construction entrance to new phase has been maintained.
Correction:
Need to sweep sidewalks and gutters along Colehaven.
|