Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-00592
StatusFinaled
Name KEVIN HONEYCUTT
Site Address 501 E PARKCENTER BLVD
Project NameThe District at Parkcenter
Customer Number 
ePlanReviewNo
Description
Cottage Building B1: 287 unit multi family new construction on 12.64+/- acres with a clubhouse, fitness center building and mail kiosk
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection7/11/20167/11/20167/11/2016 PASS
DetailsAndy J. Long
WIP on at the District. Earth work for this structure and building frame are complete. No further ESC inspections on this permit, all site development work included/inspected under main permit ESC14-00588
DOC - Permit Finaled7/11/20167/11/20167/11/2016PPASS
DetailsAndy J. Long
Aging Inspection5/9/20165/9/20165/9/2016 PASS
DetailsAndy J. Long
Vertical construction in progress. Perimeter sediment controls, track out control construction entrance in good condition. Street and gutter are free of loose dirt. No corrections.
Aging Inspection3/7/20163/7/20163/7/2016 PASS
DetailsAndy J. Long
WIP on vertical framing and interior work at the District. Rock construction entrance and rumble bars installed; apron to Parkcenter was swept last week. No trackout at time of inspection. No dewatering or irrigation water flowing through site currently.

Correction request for this week:
- turn over rock entrance to shake off dirt that is packed in. More rock may be necessary.
- have street sweeper hit the sand & dirt in gutters.
Aging Inspection1/4/20161/4/20161/4/2016 PASS
DetailsAndy J. Long
WIP on frames of apartment units and structure. Trackout prevention BMPs working well. Will check site as it continues to thaw and possibly become muddy in parking areas. No corrections at this time.
Aging Inspection11/3/201511/3/201511/3/2015 PASS
DetailsAndy J. Long
Aging Inspection9/2/20159/2/20159/2/2015 PASS
DetailsAndy J. Long
WIP at the District. No trackout, perimeter controls in good condition. Water truck on site doing rounds to control fugitive dust. No dewatering currently, however the irrigation ditch is passing through site and discharging into Logger's Creek. Work is being conducted with care around the ditch as not to stir up or dump sediment into the irrigation water. At time of inspection there was no significant plume observed.

No corrections at this time.