Permit Information
Permit NumberESC14-00608
StatusFinaled
Name RANDY REUTZEL
Site Address 4450 E WARM SPRINGS AVE
Project NameDALLAS HARRIS ESTATES NO. 12
Customer Number 
ePlanReviewNo
Description
New subdivision w/ detached stormwater pond across the street
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection10/8/201510/8/201510/8/2015 PASS
DetailsAndy J. Long
Knife has moved offsite. Tahoe Homes and has assumed CGP coverage under IDRA089 for Dallas Harris 12 and has individual City of Boise ESC permits for each SFH. Inspections of DH#12 will be conducted under SFH permit inspections. Permit finaled, ESC conditions of stabilization and cleanup satisfied.
DOC - Permit Finaled10/8/201510/8/201510/8/2015PPASS
DetailsAndy J. Long
General Inspection9/23/20159/23/20159/23/2015 PASS
DetailsAndy J. Long
General Inspection9/8/20159/8/20159/8/2015 PASS
DetailsAndy J. Long
General Inspection8/24/20158/24/20158/24/2015 PASS
DetailsAndy J. Long
General Inspection8/7/20158/7/20158/7/2015 PASS
DetailsEvan Jenkins
wip; on new homes. no esc issues observed at this time
General Inspection7/23/20157/23/20157/23/2015 PASS
DetailsAndy J. Long
WIP on homes. No new subdivision work occuring. All DIs protected. No trackout or spills observed. No violations observed.
General Inspection7/8/20157/8/20157/8/2015 PASS
DetailsAndy J. Long
DH #12 subdivision phase has SFHs in progress by Hunter and Tahoe. Streets are free of siginificant trackout. No spills or runoff from sites observed. Trash is being contained. All storm drains have sediment bags. Approved.
General Inspection6/23/20156/23/20156/23/2015 PASS
DetailsAndy J. Long
Work on stormwater pond is now complete. SFHs in progress by Hunter and Tahoe Homes. DIs have sediment bags.
General Inspection6/8/20156/8/20156/8/2015 PASS
DetailsEvan Jenkins
General Inspection5/22/20155/22/20155/22/2015 PASS
DetailsAndy J. Long
General Inspection5/7/20155/7/20155/7/2015 PASS
DetailsAndy J. Long
WIP on finishing stormwater pond for DH #12 and #13. Vertical construction by Tahoe Homes and Hunter Homes is on going. Lined washouts located in alley ways.

Note:

the original fiber mats put on inlets have been destroyed and did not last. Correction requests to Hunter in insert bags north of Wolf Tree and Tahoe south of Wolf Tree on Barnside.

See ESC15-00282 (DH Estates #13) for corrections...
General Inspection4/22/20154/22/20154/22/2015APART
DetailsAndy J. Long
No trackout, fugitive dust, or sediment runoff issues at time of inspection.

Correction:
Repair/replace damage fiber inlet protection throughout the subdivision. DI bags may be better alternative.

NOTE> DH Estates #13 (ESC15-00282) has already started and is okay to continue. Construction entrance installed. No issues at time of inspection.
General Inspection4/13/20154/13/20154/13/2015 PASS
DetailsAndy J. Long
WIP on repairing/finishing the stormwater retention pond. BMPs are installed and working to keep sediment out of storm drain system. No fugitive dust plumes crossing project limits. SFHs in progress are permitted seperately.

Will request trackout sweep up on Old Hickory later this week.
General Inspection3/27/20153/27/20153/27/2015 PASS
DetailsAndy J. Long
No corrections needed or issues at site. SFH construction has just started in DH#12. BMPs installed.
General Inspection3/12/20153/12/20153/12/2015 NR
DetailsAndy J. Long
site walk through to be conducted when new ESC site map is ready
General Inspection2/25/20152/25/20152/25/2015 PASS
DetailsAndy J. Long
WIP. Landscaping crews and power utilities crews working. No trackout to Warm Springs, no runoff or erosion issues occuring.

Some sandy trackout to Old Hickory should be swept this week or next. Lots of activity in area. Drainage pathway to Warm Springs Creek has been blocked to have onsite retention/infiltration.
Complaint Inspection2/10/20152/10/20152/10/2015PPASS
DetailsAndy J. Long
Large muddy puddle interferring with traffic on Warm Springs reported.

Called Knife River RP Jeff to check on situation & request response. Puddle is due to the fact that muddy conditions have prevented completion of the storm drain system in that area of concern to connect it to the new stormwater retention pond south of Warm Springs. If that water was not contained on site there, it would discharge to Warm Springs Creek which flows to Boise River.

To solve the issue a temporary berm was built further up in the development's staging area and water was pumped on the other side of berm so it would not be on roadway.

Crew was onsite upon arrival and puddle has subsided. Knife River/Dallas Harris will continue to work to clean up that area and hopefully be able to complete the stormwater system. The temporary berm solution appears to be working currently. No trackout or discharges offsite occuring.

Note: Mud along side roadway will be cleaned when the powerline & utility project progresses. Utility project is in ACHD R.O.W. so not permitted through City of Boise.
Tracking Control1/30/20151/30/20151/30/2015PPASS
DetailsAndy J. Long
Corrections requested 1/28 completed:

Old Hickory has been swept and west entrance blocked off. No new trackout or other issues observed.
Random Inspection1/28/20151/28/20151/28/2015PPART
DetailsAndy J. Long
No trackout to Warm Springs from Dallas Harris no. 12, but use of the west entrance is causing significant trackout to Old Hickory.

Correction request to Knife River to restrict access on that entrance due to the wet conditions and no vehicle tracking pad.

No other violations.
General Inspection1/14/20151/14/20151/14/2015 PASS
DetailsAndy J. Long
WIP. Drainage from site is flowing into the new stormwater pond and then into the pasture for infiltration.

No trackout to Warm Springs, trackout Old Hickory needs to be swept 1-2 every two weeks. Overall site is in compliance currently.
Random Inspection12/24/201412/24/201412/24/2014APART
DetailsAndy J. Long
Two new drainage culverts were recently installed to improve drainage at site after large rain. The pipes discharge to the south side of Warm Springs to the cow pastures. Not connected to Warm Springs CreeK ->Boise River. Silt fence has be installed around the inlets to capture some sediment. No longer draining.

Designated stormwater settling ponds are still full and draining. The end of pipe discharge goes into the pasture and is still flowing. Water is very muddy but not going to a waterway.(land application). Ponds are not yet complete.

Correction: Need to clean up trackout on Greenbelt, Old Hickory and some of Warm Springs.
General Inspection12/10/201412/10/201412/10/2014 PART
DetailsAndy J. Long
Work is ongoing. Some streets have been paved in development. The stormwater pond to the south of Warm Springs is being excavated. No trackout or discharges observed on Warm Springs.

Correction:

Sweep up trackout on Old Hickory from the west exit.

Overall site is in compliance, mainly due to limited activity in the past several weeks.
Random Inspection11/7/201411/7/201411/7/2014PPART
DetailsAndy J. Long
No effort to sweep up or prevent trackout on Old Hickory. Rest of site is graded so that stormwater is contained by Warm Spring Road embankment. No dewatering at time of inspection. Working an area greater than the listed disturbance. Will continue investigation.

No discharges and Warm Springs is clean and Boise permit posted
BMP Violation11/4/201411/4/201411/4/2014PFAIL
DetailsAndy J. Long
Stormwater has collected and mixed with concrete washout.

Trackout to Old Hickory due to no stabilized entrance.

Corrections:
1. Provide new washout on higher ground.
2. Sweep up trackout and prohibit use of that entrance unless a construction entrance can be installed.
General Inspection10/16/201410/17/201410/17/2014APART
DetailsAndy J. Long
check south side of Warm Springs for creek flow conditions.

Site is pumping water (unclear if groundwater dewatering or artesian spring diversion) into the wetland south of Warm Springs. Color of discharge is clear and no odor or other detectable water quality issue. Wetland is heavily vegetated with multiple settling areas. Will check outlet to Boise River next..

Trackout to Old Hickory from site observed. Will need to be swept regularly if the construction entrance isn't installed.
General Inspection10/16/201410/16/201410/16/2014ACANC
DetailsAndy J. Long
data entry error. Inspection is for 10/17
General Inspection10/15/201410/16/201410/16/2014APART
DetailsAndy J. Long
Check for additional disturbance at site...

Additional disturbance north of site is not Knife River, it is Boise Project Board of Control workers preparing to install culvert for Penn. Canal. No flow in canal. No ESC permit required due to irrigation easements.

No trackout to Warm Springs, no illicit discharges or spills observed/reported. No fugitive dust issues. Need to check Warm Springs creek out let tomorrow.
General Inspection10/15/201410/15/201410/15/2014PCANC
DetailsAndy J. Long
data entry error
Complaint Inspection9/10/20149/10/20149/10/2014PPEND
DetailsAndy J. Long
Report of a Knife River trucking doing illegal washout/dumping on Warm Springs at Old Eckart pull out. Called project manager and visited site for DHE #12 and they are not pouring concrete truck.

Truck reportedly came from east Warm Springs but I was unable to find the origin.

Posted Correction Notice to forbid further washout and clean existing waste at site as well as placing cones in front of area.

Will keep on the case till cleaned. Does not appear to be from this site.
Tracking Control8/29/20148/29/20148/29/2014PPART
DetailsAndy J. Long
CN issued for Dallas Harris #12 sub development.

1. Sweep Old Hickory from Warm Springs to north of the east access point.

2. Provide construction entrance if that entrance will be in use after stormwater pond is constructed.

Verbal CN issued to Knife River supervisor Rob.
Complaint Inspection8/11/20148/11/20148/11/2014PPART
DetailsAndy J. Long
Rocks on road; uncovered loads with debris reported in the AM

Time of inspection: 1:30 PM
Inspection observations:

1. Some track out and dust associated with truck traffic and regular traffic on Warm Springs.
2. No large rocks or debris were in roadway at time of inspection.
3. Some truckers are not using the rock vehicle tracking pad when exiting site, causing dust and trackout.
4. 2 water trucks on site, fugitive dust control is working fairly well.
5. Syman Co. is inspecting site for SWPPP requirements 2x monthly. Dewatering has now started for utility trenching work.
6. No sediment containment BMPs installed at site discharge point. Ditch connects to Warm Springs Creek which discharges to Boise River.

Corrections:
1. Sweep roadway at end of work day.
2. Need to provide sediment controls to treat groundwater and also potential stormwater discharge point. Update SWPPP and ESC site map.
3. Maintain construction entrance/exit and make sure truckers are using the exit when leaving site.
4. Increase dust suppression on Warm Springs and shoulders of road.

Verbal corrections issued to Syman Company (ESC plan design) and Knife River (operators).
BMP Violation7/28/20147/28/20147/28/2014AFAIL
DetailsEvan Jenkins
Dust Suppression Lacking
Trackout occuring hundreds of yards down warmsprings Rd.
CORRECTION NOTICE POSTED: LAST WARNING FOR DUST SUPPRESSION. CAUSING SAFETY HAZARDS ON WARM SPRINGS AVE FROM LACK OF DUST AND TRACKOUT CONTROL. FAILURE TO BECOME IN COMPLIANCE SHALL WARRENT A NOTHER STOP WORK ORDER AND A NOTICE OF VIOLATION SHALL BE ISSUED. WILL FOLLOW UP LATER THIS AFTERNOON. CORRECT IMMEDIATELY
BMP Violation7/25/20147/25/20147/25/2014PPART
DetailsEvan Jenkins
Dallas Harris Estates #12
Dust Suppression Efforts Lacking Again. Warm Springs Ave has substantial amount of sediment on it from belly dump trucks. Knife River was quick to wash down road. Followed up in the afternoon, and Knife River was able to get a 2nd Water Truck onsite to keep a water truck on both Harris Ranch 12 and East Valley Sub. Dust was suppressed when I left both sites.
BMP Violation7/22/20147/22/20147/22/2014PPART
DetailsAndy J. Long
Need a full time water truck on site for dust control. Currently truck is being sent between here and East Valley sub.

Sweep up trackout.


Random Inspection7/11/20147/11/20147/11/2014PFAIL
DetailsAndy J. Long
Observed excessive dust from rough grading project. The grass/hay has been scraped so now there is loose dirt.

No water truck on site - may be refilling but no evidence of dust suppression.

Verbal correction request to provide dust control at site discussed with Jeff from Knife River. He stated he will ensure that water truck is on site ASAP.
Site Preparation7/9/20147/9/20147/9/2014PPASS
DetailsEvan Jenkins
jeff Phone #: ###-####
Constructiion Signage and SWPPP Posted at Construction Entrance
Installing BMP's as they progress