General Inspection | 9/21/2015 | 9/21/2015 | 9/21/2015 | | PASS |
Andy J. Long
|
|
|
Project is finishing up. No futher excavation. Home built on pre-established and vegetated hillside lot with retaining walls. No loose sediment leaving. Permit finaled.
|
DOC - Permit Finaled | 9/21/2015 | 9/21/2015 | 9/21/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 9/4/2015 | 9/4/2015 | 9/4/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 8/20/2015 | 8/20/2015 | 8/20/2015 | | PASS |
Evan Jenkins
|
|
|
No issues observed at this time
|
General Inspection | 8/5/2015 | 8/5/2015 | 8/5/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 7/21/2015 | 7/21/2015 | 7/21/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/6/2015 | 7/6/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No violations.
|
General Inspection | 6/19/2015 | 6/19/2015 | 6/19/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/4/2015 | 6/4/2015 | 6/4/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | | PASS |
Andy J. Long
|
|
|
WIP. GC/RP onsite. Interior work and some excavation for stormwater need to be completed. Onsite storm drains have sediment protection and all hillsides are vegetated and have retainings walls. No sediment leaving site. Permit posted.
|
General Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Evan Jenkins
|
|
|
No Activity: same comment as previous inspection
|
General Inspection | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Evan Jenkins
|
|
|
Permit still posted, no Activity or ESC issues observed
|
General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 | | PASS |
Evan Jenkins
|
|
|
No activity at this time of inspection. No ESC issues as of now
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 3/4/2015 | 3/4/2015 | 3/4/2015 | | PASS |
Evan Jenkins
|
|
|
No Activity at this time. Permit still posted
|
General Inspection | 2/16/2015 | 2/16/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Mainly interior work occuring at this time. No esc issues
|
General Inspection | 1/14/2015 | 1/14/2015 | 1/14/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 12/12/2014 | 12/12/2014 | 12/12/2014 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 11/11/2014 | 11/11/2014 | 11/12/2014 | | PASS |
Evan Jenkins
|
|
|
WIP
|
Random Inspection | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | PASS |
Andy J. Long
|
|
|
Foundation has been poured as well as utility work in the culdesac, which is now paved and clean. No violations observed, stormdrains on driveway have filter protection and permit is posted.
|
Site Preparation | 9/2/2014 | 9/3/2014 | 9/3/2014 | A | PASS |
Andy J. Long
|
|
|
call ahead to meet - Charlie Phone #: ###-####
Existing vegetation and retaining walls are already in place. Wattles have been installed at the pad of the house. Driveway is already paved.
There will be some trenching in the culdesac so some stockpile controls may be necessary. Permit is posted and Charlie has plans to manage construction waste to maximize recycling and proper disposal.
|