General Inspection | 6/4/2015 | 6/4/2015 | 6/4/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 6/4/2015 | 6/4/2015 | 6/4/2015 | P | PASS |
Evan Jenkins
|
|
|
Project Complete with No ESC Issues ESC Conditions Satisfied
|
General Inspection | 5/20/2015 | 5/20/2015 | 5/20/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Parking lot is paved with no ESC issues. Permits posted in back of building/site near canal
|
General Inspection | 4/20/2015 | 4/20/2015 | 4/20/2015 | | PASS |
Andy J. Long
|
|
|
Parking lot is being regraded/paved currently. No offsite runoff or disharges, no trackout or sediment leaving site. Permit posted along Overland
|
General Inspection | 4/3/2015 | 4/3/2015 | 4/3/2015 | | PART |
Andy J. Long
|
|
|
WIP. Storm drains (private and MS4) have inlet protection. Parking lot already paved, no trackout or discharges.
Correction: Sweep up loose sediment in parking lot to prevent transport offsite.
|
General Inspection | 3/19/2015 | 3/19/2015 | 3/19/2015 | | PASS |
Andy J. Long
|
|
|
Work on interior utilities within building shell is occuring. All receiving storm drains have inlet protection. No trackout or runoff occuring. Landscapers working and also cleaning parking lot area.
|
General Inspection | 3/4/2015 | 3/4/2015 | 3/4/2015 | | PASS |
Andy J. Long
|
|
|
WIP on interior of warehouse. Private stormdrains on site and MS4 on Overland have protection. No trackout or discharges occuring at time of inspection. Approved.
|
General Inspection | 2/17/2015 | 2/17/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/30/2015 | 1/30/2015 | 1/30/2015 | | PASS |
Andy J. Long
|
|
|
WIP on exeterior of building shell. The silt fence that was no longer needed due to installed curbing has been removed. All storm drain inlets have sediment protection. ESC14-00712 which was for the grading/drainage has been finaled. This permit is for vertical construction and site landscaping. No corrections at this time.
|
DOC - Permit Finaled | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
General Inspection | 1/15/2015 | 1/15/2015 | 1/15/2015 | | PASS |
Andy J. Long
|
|
|
Warehouse frame is up and parking lot is paved.. WIP. No ESC violations observed.
|
General Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/12/2014 | 12/12/2014 | 12/12/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout. Stormdrains protected. Canal is not currently flowing and parking lot curbing has been installed, so some sections of silt fence have been removed.
ESC permit posted. No corrections needed at this time.
|
General Inspection | 11/12/2014 | 11/12/2014 | 11/12/2014 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout to Cloverdale, DI inlet at existing paved entrance has sediment protection, permit posted visibly, and rear silt fence is installed between area of disturbance and canal (currently dry). No corrections required at this time.
|
General Inspection | 10/17/2014 | 10/20/2014 | 10/20/2014 | A | PASS |
Andy J. Long
|
|
|
Site has combination of silt fence and construction fencing to establish a perimeter control and control access. Permit is posted, construction entrance is a paved surface. Surrounding stormdrain inlets at carwash at business building have sediment protection. MS4 on Overland as well. No trackout, dust, or uncontained trash observed. Approved.
|
General Inspection | 10/16/2014 | 10/16/2014 | 10/17/2014 | | CANC |
Andy J. Long
|
|
|
rescheduled for Monday 10/20
|
Conference | 8/28/2014 | 8/28/2014 | 8/28/2014 | P | PASS |
Andy J. Long
|
|
|
Met Kevin from ESI to discuss minor site prep activity and installation of perimeter silt fence prior to issuance BLD permit.
Approved to prep site with no excavation or BLD activities. Current use is gravel storage yard. BMPs are drop inlet protection on Overland and silt fence perimeter.
|