Aging Inspection | 4/8/2015 | 4/8/2015 | 4/8/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. Yard is landscaped and stabilized. Construction materials and loose sediment have been cleaned up. Permit finaled.
|
DOC - Permit Finaled | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No violations.
|
Site Preparation | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
Met GC for Boise Building Co. John at site. Infill in over 55 community. No surface water next to site. Main BMP will be daily cleanup. Concrete washout provided on adjacent lot. Approved for construction.
|