Aging Inspection | 4/8/2015 | 4/8/2015 | 4/8/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete. ESC permit conditions satisfied. Permit finaled.
|
DOC - Permit Finaled | 4/8/2015 | 4/8/2015 | 4/8/2015 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 2/6/2015 | 2/6/2015 | 2/6/2015 | | PASS |
Andy J. Long
|
|
|
WIP on SFHs in Brookview senior subdivision. No trackout, uncontained trash, or loose sediment/mud in gutters. No corrections required.
|
Site Preparation | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Andy J. Long
|
|
|
John Phone #: ###-####
Met GC for Boise Building Co. John at site. Infill in over 55 community. No surface water next to site. Main BMP will be daily cleanup. Concrete washout provided on adjacent lot. Approved for construction.
|