General Inspection | 11/2/2015 | 11/2/2015 | 11/2/2015 | | PASS |
Andy J. Long
|
|
|
No construction activity at and associated BLD is finaled. Landscaping has been completed along Reserve Street and parking lot has been cleaned. There is a strip of the parcel behind building that is not landscaped or stabilized, but no loose sediment or runoff concerns.
Permit finaled.
|
DOC - Permit Finaled | 11/2/2015 | 11/2/2015 | 11/2/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 8/31/2015 | 8/31/2015 | 8/31/2015 | | CANC |
Evan Jenkins
|
|
|
Tag on Parcel No ESC Inspection
|
General Inspection | 6/29/2015 | 6/29/2015 | 6/29/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Stubbing into sewer on Reserve at the moment. Stockpile stored safely. No trackout, discharges, or sediment runoff. No fugitive dust or uncontained trash/materials. Site is enclosed with chain link security fence. No violations observed.
|
General Inspection | 4/28/2015 | 4/28/2015 | 4/28/2015 | | PASS |
Andy J. Long
|
|
|
WIP on armory renovation & window sill installation. No trackout from site. Excavated dirt stored on grass within site to prevent runoff on hard surfaces to storm drains.
Approved.
|
General Inspection | 2/23/2015 | 2/23/2015 | 2/23/2015 | | PASS |
Andy J. Long
|
|
|
No activity or earth disturbance at site. New phase and seismic upgrade for armory still under review. No corrections needed at this time.
|
General Inspection | 12/24/2014 | 12/24/2014 | 12/24/2014 | | PASS |
Andy J. Long
|
|
|
No activity. Site is surrounded by chain link fencing. No ESC issues.
|