Site Final | 11/21/2014 | 11/21/2014 | 11/21/2014 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 11/21/2014 | 11/21/2014 | 11/21/2014 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 8/13/2014 | 8/13/2014 | 8/13/2014 | P | PEND |
Andy J. Long
|
|
|
Initial corrections have been completed. Oil spill has been cleaned, but pavement is still stained.
Sidewalk has been swept and stockpile moved back onto lot.
Remaining corrections: street sweeping and maintenance on permeable pavers after utilities are installed and foundations backfilled at the end of this week.
|
Site Preparation | 8/13/2014 | 8/13/2014 | 8/13/2014 | A | PART |
Mike Jordan
|
|
|
All hard surfaces have been sweeped.
|
Conference | 8/12/2014 | 8/12/2014 | 8/12/2014 | P | PEND |
Andy J. Long
|
|
|
Met RP/GC Andy at site to discuss the BMP violatons.
Corrections due today: 1. Spill absorbent to be poured on oil spill (this has been completed) 2. Brundage Bone will clean up absorbent and dispose of properly.
Tomorrow morning: 1. Hard Rock Excavation will be moving stockpiles/backfilling and gutter and sidewalk will be swept by Andy
Later in the week after utility installation: 1. Street sweeping.
Will assess need for wattles once backfill is complete.
|
BMP Violation | 8/12/2014 | 8/12/2014 | 8/12/2014 | A | FAIL |
Andy J. Long
|
|
|
Sediment leaving site and accumulating on sidewalk, street, and permeable pavers across the street.
Oil spill in the street from concrete pumping truck. Pictures taken.
Corrections: 1. Clean up oil spill with absorbent material and dispose of appropriately. 2. Sweep up sidewalk, street, gutter. 3. Attempt to blow sediment out of pavers (will prevent infiltration.)
Meeting RP-GC on site to discuss. Written correction notice posted.
|