General Inspection | 6/24/2015 | 6/24/2015 | 6/24/2015 | | PASS |
Andy J. Long
|
|
|
Hillside is stabilized and vegetated with drip irrigation installed. Toe of slope has rock retaining wall. No sediment runoff to sidewalk or gutter visible. Hillside revegetation bond issued and returned. No further ESC inspections necessary. Permit conditions satisfied.
|
DOC - Permit Finaled | 6/24/2015 | 6/24/2015 | 6/24/2015 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/9/2015 | 6/9/2015 | 6/9/2015 | | PEND |
Evan Jenkins
|
|
|
Establishment of Perm Vegetation. Near Achieved
|
General Inspection | 5/22/2015 | 5/22/2015 | 5/22/2015 | | PASS |
Andy J. Long
|
|
|
occupied hillside home is revegetating/stabilizing. Planning bond issued to acheive stabilization requirements. No issues at site.
|
General Inspection | 5/7/2015 | 5/7/2015 | 5/7/2015 | | PASS |
Evan Jenkins
|
|
|
still waiting for re-vegetation to be established
|
General Inspection | 4/22/2015 | 4/22/2015 | 4/22/2015 | | PASS |
Evan Jenkins
|
|
|
Vegetation needs to be re-established. No discharges occuring from disturbed areas.
|
General Inspection | 4/7/2015 | 4/7/2015 | 4/7/2015 | | PASS |
Evan Jenkins
|
|
|
waiting for perm vegetation to establish
|
General Inspection | 3/23/2015 | 3/23/2015 | 3/23/2015 | | PASS |
Andy J. Long
|
|
|
Construction complete and home is ready to be occupied. Site is not yet vegetated/landscaped as mentioned previously and is on a hillside. A bond for hillside stabilization and drainage has been issued.
Will keep ESC permit open till stabilization accomplished. Currently the rooftop storm drain outlet will discharge to bare ground on the hillside so could cause rill erosion if not landscaped soon. No sediment leaving site currently.
|
General Inspection | 3/6/2015 | 3/6/2015 | 3/6/2015 | | PASS |
Evan Jenkins
|
|
|
Regraded recently. Prepped for perminant vegetation establishment. No ESC issues at this time
|
General Inspection | 2/19/2015 | 2/19/2015 | 2/20/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Evan Jenkins
|
|
|
Final Stabilization near complete no esc issues at this time
|
General Inspection | 1/20/2015 | 1/20/2015 | 1/20/2015 | | PASS |
Evan Jenkins
|
|
|
BLD and other permits are finaled, but ESC is waiting for Final stabilization to take place. Near complete for ESC
|
General Inspection | 12/31/2014 | 12/31/2014 | 12/31/2014 | | PASS |
Evan Jenkins
|
|
|
No ESC Issues at time of inspection
|
Site Preparation | 9/2/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Andy J. Long
|
|
|
Dan Appel - hillside lot site prep inspection 10:00 AM
RP Dan onsite. Rock Placing company will be installing rock retaining walls after initial excavation. For first phase existing vegetation will be preserved and once removed a fiber wattle will be installed along the toe of the slope adjacent to sidewalk.
Permit posted. Need to inspect after walls are installed to check for drainage outlet points.
Approved.
|