DOC - Permit Finaled | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | PASS |
Andy J. Long
|
|
|
Site grading and drainage is complete - which is what this permit was for on the project. Newly installed inlets have been fitted with sediment filter bags. Vertical construction is now covered under BLD13-002003 / ESC14-00656. No further inspections on this permit. All ESC conditions must be satisfied upon final for ESC14-00656
|
General Inspection | 1/21/2015 | 1/21/2015 | 1/21/2015 | | PASS |
Andy J. Long
|
|
|
Grading and drainage is complete. Area of disturbance is now paved and curbed in with the receiving storm drain having a filter bag.
Talked to ESI foreman and he stated they plan to remove the silt fence that is no longer needed due to curbing install. No trackout to Cloverdale; MS4 DI has protection. See also ESC14-00656
|
General Inspection | 12/31/2014 | 12/31/2014 | 12/31/2014 | | PASS |
Evan Jenkins
|
|
|
|