DOC - Permit Finaled | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PASS |
Andy J. Long
|
|
|
|
Site Final | 3/17/2015 | 3/17/2015 | 3/17/2015 | P | PASS |
Andy J. Long
|
|
|
All earthwork and landscaping for 4-plex complete. Temp. Occupancy granted, building still requires painting. Area has been cleaned of construction materials and loose sediment. Storm drains still have inlet protection for ongoing work.
|
General Inspection | 2/17/2015 | 2/17/2015 | 2/23/2015 | | PASS |
Andy J. Long
|
|
|
In process of being landscaped. Some loose sediment and material stockpile areas will need to be swept once complete. No trackout or sediment runoff. Main streets & gutters of Aberdeen Square are clean and DIs have filter protection.
|
General Inspection | 1/1/2015 | 1/1/2015 | 1/2/2015 | | PASS |
Andy J. Long
|
|
|
|