Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-00725
StatusFinaled
Name JOE ROTH
Site Address 3945 S TALUS AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection6/9/20156/9/20156/9/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled6/9/20156/9/20156/9/2015PPASS
DetailsEvan Jenkins
ESC Condistions Satisfied
No Issues
General Inspection5/25/20155/25/20155/26/2015 PASS
DetailsAndy J. Long
General Inspection5/8/20155/8/20155/8/2015 PASS
DetailsAndy J. Long
General Inspection4/23/20154/23/20154/23/2015 PASS
DetailsAndy J. Long
WIP on interior. Downslope gator guard protecting canal right-of-way area is installed properly. No correcitons needed at this time.
General Inspection4/8/20154/8/20154/8/2015 PASS
DetailsAndy J. Long
Sediment controls on site perimeter discharge points are installed and working effectively. Frame of home is complete. Stucco waste being contained in a pit to prevent runoff. Trash container provided and in use. No corrections at this time.
General Inspection3/24/20153/24/20153/24/2015 PASS
DetailsAndy J. Long
WIP. No sediment trackout or runoff from construction area. Downslope wattle is installed. Trash contained. Approved.
General Inspection3/9/20153/9/20153/10/2015 PASS
DetailsAndy J. Long
WIP. BMPs installed. Home is near completion. No trackout.
General Inspection2/20/20152/20/20152/20/2015 PASS
DetailsAndy J. Long
General Inspection2/5/20152/5/20152/5/2015 PASS
DetailsAndy J. Long
WIP progress. Sediment containment BMPs on the lower side of home are keeping sediment from leaving site and going to canal right-of-way.

Permit posted on fence, trash container on site and no litter blowing around.

No corrections needed, site in compliance.
General Inspection1/21/20151/21/20151/21/2015 PASS
DetailsAndy J. Long
WIP. Trash and waste materials are contained. Silt fence perimeter is installed around north and west side of site. Wattle is trenched in between access drive and the canal easement fence to contain any sediment runoff down the road. Permit posted. No violations observed.