Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC14-00731
StatusFinaled
Name CHARLEY COOPER
Site Address 1259 E HEARTHSTONE DR
Project NameNew SFH Highlands infill
Customer Number 
ePlanReviewNo
Description
Westminster Homes project on vacant lot in established subdivision in Hillside zone. ESC plan and narrative submitted by valid PD. RP listed as George Cooper. BMPs include downstream inlet protection for sediment, silt fence along edge of street,dust control as needed, stockpile management, stabilization of inactive or completed areas, track out clean up, concrete washout containment, and housekeeping. Existing vegetation and shrubs will be kept on the rear portion of lot. ESC site preparation inspection required prior to excavation. Call 384-3802 or 794-8996
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/8/20159/8/20159/8/2015 PASS
DetailsAndy J. Long
Construction complete and home is occupied. Street,sidewalk and gutter have been swept and cleaned. Yard landscaped/stabilized with temp BMPs removed.

Hillside revegetation /stabilization bond issued by Public Works hillside review in effect. No further ESC inspections.
DOC - Permit Finaled9/8/20159/8/20159/8/2015PPASS
DetailsAndy J. Long
General Inspection8/24/20158/24/20158/24/2015 PASS
DetailsAndy J. Long
General Inspection8/7/20158/7/20158/7/2015 PASS
DetailsAndy J. Long
WIP on interior. Yard not yet landscaped or complete. No discharges or significant amounts of dirt leaving site. RP dug sediment capture trough a long sidewalk.
General Inspection7/23/20157/23/20157/23/2015 PASS
DetailsAndy J. Long
WIP. Section of sidewalk & gutter are being repaired. Existing sidewalk is clear of sediment and no discharges or other issues observed.
Complaint Inspection7/8/20157/8/20157/8/2015PFAIL
DetailsAndy J. Long
Loose sand and dirt on sidewalk and gutter. Stockpile of sand located in area where runoff from irrigation carries across sidewalk to gutter.
Need to clean up sidewalk and gutter in front of house and move stockpile & rake back sand
General Inspection6/24/20156/24/20156/24/2015 PART
DetailsAndy J. Long
No discharges, trash and materials contained.

1 correction needed.

- sweep up dust on sidewalk and gutter from the concrete saw cutting that occured.

Request called to RP Charlie Cooper
General Inspection6/9/20156/9/20156/9/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time
General Inspection5/25/20155/25/20155/26/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time
General Inspection5/8/20155/8/20155/8/2015 PASS
DetailsEvan Jenkins
General Inspection4/22/20154/22/20154/22/2015 PASS
DetailsEvan Jenkins
WIP: no issues at this time
General Inspection4/3/20154/3/20154/3/2015 PASS
DetailsEvan Jenkins
WIP: straw waddle installed along bottom of streep front yeard keeping sediment from discharging onto the sidewalk and ACHD's ROW. no corrections needed at this time
General Inspection3/19/20153/19/20153/19/2015 PASS
DetailsEvan Jenkins
Sediment has been swept up. No activity at time of inspection.
No ESC issues at this time
General Inspection3/4/20153/4/20153/4/2015 PASS
DetailsAndy J. Long
WIP. Permit posted. Some accumulation of dirt & sand in gutter directly in front of home site needs sweeping, but is not affecting a DI or leaving area. Will be addressed in housekeeping.

No trash containment issues or hillside erosion occuring. Contractors parking on street so no trackout.
General Inspection2/17/20152/17/20152/23/2015 CANC
DetailsAndy J. Long
BMP Violation1/22/20151/23/20151/23/2015APEND
DetailsAndy J. Long
Corrections in progress. Will check after weekend. No active erosion or discharges, just need to finish sweeping gutter/sidewalk.
BMP Violation1/21/20151/22/20151/22/2015ACANC
DetailsAndy J. Long
rescheduled for 1/23
General Inspection1/21/20151/21/20151/21/2015 FAIL
DetailsAndy J. Long
Muddy sidewalk and gutter. No discharges to MS4 (which drains to Crane Creek) at time of inspection. No BMPs installed along bank and sidewalk to contain sediment.

Verbal CN issued to RP-GC Charlie Cooper.