Permit Information
Permit NumberESC14-00751
StatusFinaled
Name SHAUN GAFFORD
Site Address 707 E RESERVE ST
Project NameBoise Fire Station #1
Customer Number 
ePlanReviewNo
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection7/9/20157/9/20157/9/2015 PASS
DetailsAndy J. Long
Work is complete, hard surfaces swept and cleaned, temp BMPs removed. ESC conditions satisfied.
DOC - Permit Finaled7/9/20157/9/20157/9/2015PPASS
DetailsAndy J. Long
General Inspection6/24/20156/24/20156/24/2015 PASS
DetailsAndy J. Long
WIP. No trackout to Reserve, no offsite discharges. Storm drain has coir mat sediment barrier installed. No dust or other stormwater pollution sources observed.
General Inspection6/9/20156/9/20156/9/2015 PASS
DetailsEvan Jenkins
WIP: No ESC issues at this time
General Inspection5/25/20155/25/20155/26/2015 PASS
DetailsAndy J. Long
WIP on Fire Station improvements. Yellow permit sign is posted on street, no trackout or discharges to Reserve or access street south of station. No corrections required.
General Inspection5/8/20155/8/20155/8/2015 PASS
DetailsAndy J. Long
Work on fire station site improvement is in progress. Permit sign posted on Reserve. No trackout or loose materials leaving site. No activity yet on pathway, currently grading for repaving and installing new stormwater swale.
General Inspection4/23/20154/23/20154/23/2015 PASS
DetailsAndy J. Long
WIP on Fire Station #1 site improvement project. No trackout. Onsite stormdrains have sediment protection. Approved.
Conference4/7/20154/8/20154/8/2015APASS
DetailsAndy J. Long
9 AM pre-construction meeting scheduled

Meeting to discuss project at City Hall and onsite walk through inspection were conducted.

BMPs will include inlet protection on the small drop inlet on southeast curbing. Once the stormdrains are replaced by drainage swale, the swale will require protection until project completion.

The final phase of project to build ramps on ACHD greenbelt path will occur in June. At this time, wattles will be installed along fence line to protect the flume adjacent to the path.

Approved for construction. Work to begin next Monday April 13.
General Inspection4/7/20154/7/20154/7/2015 NR
DetailsAndy J. Long
Pre-construction meeting scheduled for tomorrow. No activity or earth work occuring at site yet.
Random Inspection1/23/20151/23/20151/23/2015PCANC
DetailsAndy J. Long