DOC - Permit Finaled | 4/3/2015 | 4/3/2015 | 4/3/2015 | P | PASS |
Andy J. Long
|
|
|
Construction complete, home occupied. Site has been cleaned and yard stabilized with bark mulch, bushes, and trees. DI bags to remain in inlets as work on nearby homes continues. ESC conditions met.
|
Aging Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Andy J. Long
|
|
|
Home is complete. Site needs landscaping/stabilization and final site cleanup. No discharges, spills, or uncontained trash. BLD already finaled.
|
DOC - Permit Finaled | 2/4/2015 | 2/4/2015 | 2/4/2015 | P | PASS |
Andy J. Long
|
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
Site Preparation | 9/3/2014 | 9/4/2014 | 9/4/2014 | A | PASS |
Andy J. Long
|
|
|
site prep inspection so we can dig Friday. thanks Phone #: ###-#### >> Inspection requested via web by Joshua Edwards
Permit posted. BMPs at Mill District Square are adequate and streets/gutters are free of significant sediment accumulations. Ready for construction.
|