DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/15/20159/15/20159/15/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled9/15/20159/15/20159/15/2015PPASS
DetailsEvan Jenkins
Complete
ESC conditions satisfied
General Inspection7/31/20157/31/20157/31/2015 PEND
DetailsEvan Jenkins
General Inspection6/15/20156/15/20156/16/2015 PEND
DetailsEvan Jenkins
For Perm Vegetation Establishment
Random Inspection4/28/20154/28/20154/28/2015PPEND
DetailsAndy J. Long
Construction on warehouse complete and BLD is finaled.

No trackout, discharges, or dust at site. ESC permit not ready for final, need to stablize/hydroseed the berms on the lot to the east that was used for staging and stockpiling. Parking lot should be swept and port-a-pot removed when work complete.
General Inspection3/24/20153/25/20153/25/2015PPASS
DetailsAndy J. Long
Project near completion. Warehouse frame is complete and parking lot and stormwater infrastructure installed. Work is ongoing on interior as well as final site cleanup activities.

No trackout to Executive, no runoff or nonstormwater discharges observed. Trash is contained and no litter or materials blowing around site.

Will need to remove stockpile to east of parking lot next to job trailor and stabilize the disturbed area on the lot before be able to final the ESC permit.
General Inspection3/24/20153/24/20153/24/2015 CANC
DetailsAndy J. Long
rescheduled
General Inspection2/2/20152/2/20152/2/2015 PASS
DetailsAndy J. Long
Warehouse walls have been erected. Site is flat and is staying well within designated area of disturbance. Construction entrance installed, no significant trackout. Approved.
Site Preparation10/14/201410/14/201410/14/2014PPASS
DetailsAndy J. Long
Kyle-please call to meet Phone #: ###-####

Reviewed project and SWPPP with RP Kyle. Will not require the silt fence on west side of site, the existing perimeter is bermed to direct sheet flow inward to the site.

Main BMP will be the stabilized construction entrance which is to be installed tomorrow morning. No MS4 inlets or conveyances receive stormwater from site. Flat; canal on north boundary is in under ground culvert.

Excavation to begin tomorrow. Approved.
Site Preparation10/13/201410/14/201410/14/2014ACANC
DetailsAndy J. Long
Kyle-please call to meet Phone #: ###-####

Rescheduled for PM