Site Final | 3/3/2015 | 3/3/2015 | 3/3/2015 | A | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 3/3/2015 | 3/3/2015 | 3/3/2015 | P | PASS |
Phil Shearer
|
|
|
|
Aging Inspection | 1/29/2015 | 1/29/2015 | 1/29/2015 | | PASS |
Andy J. Long
|
|
|
3 townhomes in a row on Shoshone. Sidewalk is clean, no spills or trash around site observed. Permit posted on tree. No corrections required. Near completion but needs landscaping/stabilization. BLD is open.
|
Complaint Inspection | 9/9/2014 | 9/9/2014 | 9/9/2014 | P | FAIL |
Andy J. Long
|
|
|
complaint about sediment trackout and neighborhood disturbance...
Permit are posted for 3 adjacent "skinny homes" but there is backfill from the foundation process that needs to be swept off sidewalk and street.
Verbal correction notice issued to Hard Rock construction.
|