DOC - Permit Finaled | 4/2/2015 | 4/2/2015 | 4/2/2015 | P | PASS |
Andy J. Long
|
|
|
Grading for hangar is complete. Vertical construction in progress. Work now covered under ESC14-00941. Permit finaled.
|
General Inspection | 3/24/2015 | 3/24/2015 | 3/24/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Hangar walls have been erected. Construction entrance is getting some mud due to recent rains, but no significant trackout to Gowen Road. Area of disturbance is 14 acres located within large open south runway area. No dust or other issues.
|
General Inspection | 2/4/2015 | 2/4/2015 | 2/4/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No trackout to Gowen Road; permit posted on security fence (project located within airport restricted runway area). Working on putting up the hangar walls. This permit is covers the grading and drainage for the site, which is not yet complete. Vertical construction and TI build out of hangar are covered under ESC14-00941 and ESC14-01128 respectively.
|
Site Preparation | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Evan Jenkins
|
|
|
Brian Phone #: ###-#### Permit Posted on Fence at entrance. Contractor wants to attempt to use Recycled Asphalt for a construction road. I said thats fine, but if there are any tracking issues, they need to install a rock construction entrance, he agreed. Its approximately 1000ft from where they are disturbing earth and hauling till they hit gowen rd. Silt fence installed along the north section of the area.
|
Site Preparation | 9/30/2014 | 10/3/2014 | 10/2/2014 | A | FAIL |
Evan Jenkins
|
|
|
Brian Phone #: ###-#### Permit Not Posted nor any type of BMP installed. Called RP Brian via phone and left VM to get these addressed prior to requesting another site prep inspection. I'll await to hear back from him and explain in person the City's Requirements. I disclosed to dozer operator and no grading or any other earth disturbing activities can occur before site prep approval. He agreed. He is currently installed the construction entrance
|