General Inspection | 8/4/2015 | 8/4/2015 | 8/4/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 8/4/2015 | 8/4/2015 | 8/4/2015 | P | PASS |
Evan Jenkins
|
|
|
SFH Complete Disturbed areas re-vegetated ESC Conditions Satisfied
|
General Inspection | 7/20/2015 | 7/20/2015 | 7/20/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: Perm re-vegetation establishment. No issues observed at this time
|
General Inspection | 7/3/2015 | 7/3/2015 | 7/6/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/18/2015 | 6/18/2015 | 6/18/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 6/3/2015 | 6/3/2015 | 6/3/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 5/19/2015 | 5/19/2015 | 5/19/2015 | | PASS |
Andy J. Long
|
|
|
WIP. Permit sign posted. DI on culdesac has sediment protection. No discharges or spills. Trash container being utilized on site. Approved.
|
General Inspection | 5/4/2015 | 5/4/2015 | 5/4/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: BMP's still in place. No discharges leaving the site. No ESC issues/violations at this time
|
General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | PASS |
Andy J. Long
|
|
|
Permit posted. Perimeter wattles contain sediment on site. Culdesac is clean, DI has coir mat filter. Trash contained. WIP.
|
General Inspection | 4/2/2015 | 4/2/2015 | 4/2/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 3/16/2015 | 3/16/2015 | 3/16/2015 | A | PASS |
Andy J. Long
|
|
|
WIP. Home frame is up and work is occuring on exterior and interior. Trash is contained, storm drain inlet on culdesac has sediment protection, and straw wattles are trenced in on slope areas of site perimeter. No corrections at this time.
|
Tracking Control | 12/8/2014 | 12/8/2014 | 12/8/2014 | P | PART |
Andy J. Long
|
|
|
Verbal corretion issued to homeowner RP Eric.
Sweep up sand and dirt tracked out from foundation work last week. Can wait till it dries for more effective sweeping.
Clean out fiber drop inlet protection mat and shovel the collected sediment/sand in gutter.
Eric stated he will start corrections today and finish tomorrow.
No other violations at site, permit posted.
|
Site Preparation | 10/29/2014 | 10/30/2014 | 10/30/2014 | A | PASS |
Andy J. Long
|
|
|
Eric-please go after 9:30-call for access Phone #: ###-####
Met homeowner RP/builder Eric onsite. BMPs installed include perimeter wattles and permit sign. Eric will install a coir drop inlet mat to protect the stormdrain at bottom of culdesac.
Approved for construction - will start next Monday.
|