DOC - Permit Finaled | 5/1/2015 | 5/1/2015 | 5/1/2015 | P | PASS |
Andy J. Long
|
|
|
This phase of St. Lukes MSTI vault expansion and accelerator TI has been finaled. ESC inspections of project to be covered under ESC14-01105 & 06. No violations at site. BMPs included trash and material containment, concrete washout bin, and inlet protection.
|
General Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/2/2015 | 4/2/2015 | 4/2/2015 | | PASS |
Andy J. Long
|
|
|
WIP on basement expansion at MSTI. Permit posted. Staging area secured and good condion. No corrections required at this time.
|
General Inspection | 3/18/2015 | 3/18/2015 | 3/18/2015 | | PASS |
Andy J. Long
|
|
|
WIP on basement vault project addition on St. Lukes/ MSTI. Permit is posted, receiving MS4 drop inlet has sediment protection, concrete washout bin service is being utilized, and work area surrounded by security fence. No trackout or discharges from site. No corrections necessary. Other phases of project covered by ESC14-01105-06
|