DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/20/20158/20/20158/20/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled8/20/20158/20/20158/20/2015PPASS
DetailsEvan Jenkins
ESC Conditions Satisfied
General Inspection8/5/20158/5/20158/5/2015 PEND
DetailsEvan Jenkins
Carports Complete
Interior Roads need final Sweeping from Carport work prior to permit being closed.
Temp BMP's have been Removed
General Inspection7/21/20157/21/20157/21/2015 CANC
DetailsAndy J. Long
no inspection, wip on carports. Next general inspection will check for temp BMP removal and final cleanup. Site already stabilized.
Site Final7/2/20157/6/20157/7/2015ANR
DetailsAndy J. Long
WIP on carports. Some loose dirt in unfinished section will be swept up before paint striping. No discharges, spills, or trackout. DI bags were removed previously but will wait till all work, equipment, and loose dirt is swept.
General Inspection7/2/20157/2/20157/2/2015 CANC
DetailsAndy J. Long
Site final rescheduled for Monday July 6
General Inspection6/17/20156/17/20156/17/2015 PEND
DetailsEvan Jenkins
Project has been completed, but Temporary BMP's still in Place (Drop Inlet Protection).
Called Ken and disclosed if he gets the temp BMP's removed, I'll close the permit. Ken stated he will get somebody out here today to get them removed.
General Inspection6/2/20156/2/20156/2/2015 PEND
DetailsEvan Jenkins
4-Plexes are complete, perm vegetation has been re-established.
Remove Temp BMP's (Drop Inlet Protection) and large Blue PVC Pipe from sidewalk (Water Main Pipe) prior to this permit being closed
General Inspection5/18/20155/18/20155/18/2015PPASS
DetailsAndy J. Long
Bristlegrove subdivision has been landscaped and all 7 units are near completion.

No discharges, trackout, or uncontained trash/materials. To final permit need to sweep parking lot and remove any remaining contruction equipment or materials. All 7 ESC permits for the individual units ESC14-00443 to -00449 were finaled 5/18
General Inspection5/4/20155/4/20155/4/2015 PASS
DetailsEvan Jenkins
Area has been completely re-vegetated. Still some interior construction occuring. Permit shall be Finaled once area has been swept, and Temp BMP's have been Removed. No ESC issues at this time
General Inspection4/17/20154/17/20154/17/2015 PASS
DetailsEvan Jenkins
WIP: near completion. Landscaping in full action to establish vegetation. No ESC issues at this time
General Inspection4/2/20154/2/20154/2/2015 PART
DetailsEvan Jenkins
Contacted Ken Skaggs via cell to disclose the internal streets and sidewalks need a good sweeping. He stated they will do so. All drainage stays on site via seepage beds. Will follow up at next inspection
General Inspection3/18/20153/18/20153/18/2015 PART
DetailsEvan Jenkins
Streets need to be swept as well as sidewalks. Concrete washout needs to be replaced as well. Talked with Justin onsite. He stated they will sweep and address the concrete washout today
Aging Inspection2/6/20152/6/20152/6/2015 PASS
DetailsEvan Jenkins
Random Inspection9/19/20149/19/20149/19/2014PPASS
DetailsAndy J. Long
No activity at Bristlegrove Sub at time of inspection. Perimeter wattles are in place. Permit posted, no trackout, dust, or non-stormwater discharges observed. No corrections at this time.
Site Preparation9/10/20149/10/20149/10/2014PPEND
DetailsAndy J. Long
Bristle Grove sub inspection:



Utility work and rough grading at site appears to have commenced with out ESC or other permits. Checking with planning division to figure out if this was approved.

ESC BMPs are installed; no significant trackout and irrigation canal is protected with wattle and vegetated buffer.

Will check to see if correct process has been followed.
Site Preparation9/9/20149/9/20149/10/2014PCANC
DetailsAndy J. Long
inspection conducted on 9/10