Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberESC14-00865
StatusFinaled
Name TOM CROWELL
Site Address 7609 W OVERLAND RD
Project NameBoise Spectrum
Customer Number 
ePlanReviewNo
Description
SITE AND FACADE IMPROVEMENT PROJECT INVOLVING THREE BUILDINGS, IN THE BOISE SPECTRUM COMPLEX AND THE PLAZA SPACE.

THE NEW SPECTRUM SITE IS COMPOSED OF A FIRE PIT SURROUNDED BY SEATING AND COVERED BY AN X-SHAPED STRUCTURE THAT SUPPORTS FABRIC SHADING DEVICES. A LINEAR SECTION OF PERMANENT UMBRELLAS WITH ADDITIONAL SEATING AND AT GRADE WATER FEATURE LINES THE CENTER OF THE SITE FROM NORTH TO SOUTH. SPLASH PAD AND CHILDREN'S PLAYGROUND WILL TAKE THE PLACE OF THE EXISTING BEACH VOLLEYBALL COURT AT THE SOUTH EAST CORNER, AND THE EXISTING FOUNTAIN AT PLAZA CENTER WILL BE RE-FINISHED.

FACADE IMPROVEMENTS INCLUDE REMOVAL OF OUT-DATED ARCHITECTURAL CORNICES, FRIEZE, INSET TILES AND OTHER ORNAMENTS. THE BUILDINGS WILL NOW HAVE CLEAN LINES, PERFORATED METAL SCREENS AND LIFESTYLE BOARDS ADORNING THE FACADES. FLAT ROOFS WITH PARAPETS WILL REPLACE THE EXISTING HIP AND GABLE ROOFS, DISTRESSED WOOD AND STONE WILL COMPLIMENT THE UPDATED EIFS FINISH DETAILS.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/14/20159/14/20159/14/2015 PASS
DetailsAndy J. Long
Work complete. Site cleaned and stabilized. ESC permit conditions satisfied.
DOC - Permit Finaled9/14/20159/14/20159/14/2015PPASS
DetailsAndy J. Long
General Inspection7/28/20157/28/20157/29/2015 PASS
DetailsAndy J. Long
WIP on painting Spectrum renovated buildings. New landscaping, curbing, and earthwork is complete. Will need to clean up staging area and remove DI bags in parking lot before closing permit. No corrections at this time.
General Inspection6/11/20156/11/20156/11/2015 PASS
DetailsEvan Jenkins
WIP: Permit still posted
No ESC issues at this time
General Inspection4/23/20154/24/20154/24/2015APASS
DetailsAndy J. Long
Spectrum facade renovation and central square brick/paver project is in progress. Permit posted on security fence on south end of project. No trackout or discharges. Perimeter wattles installed and lined concrete washout pit has been provided.

Approved.
Site Preparation4/23/20154/24/20154/23/2015ACANC
DetailsAndy J. Long
data entry error
General Inspection4/23/20154/23/20154/23/2015 CANC
DetailsAndy J. Long
rescheduled