DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/16/20159/16/20159/16/2015 PASS
DetailsEvan Jenkins
DOC - Permit Finaled9/16/20159/16/20159/16/2015PPASS
DetailsEvan Jenkins
Silt fence has been removed.
ESC conditions satisfied
General Inspection9/1/20159/1/20159/1/2015 PEND
DetailsAndy J. Long
Silt fence still installed. Sent reminder email to KR about requirement to remove silt fence. No erosion or sediment runoff occuring, just need to remove the temporary BMP.
General Inspection8/17/20158/17/20158/17/2015 PEND
DetailsAndy J. Long
Knife River still required to remove silt fence. Ground is stabilized & no construction activity. KR stated they would remove it.
General Inspection7/31/20157/31/20157/31/2015 FAIL
DetailsAndy J. Long
Need to remove temp BMP silt fence. Project has been complete for long time and silt fence is no longer needed and is starting to degrade and tatter.

Called Mike Cole with Knife River to remove silt fence. Syman installed but stated KR was to remove fence.
General Inspection7/16/20157/16/20157/16/2015 CANC
DetailsAndy J. Long
General Inspection7/1/20157/1/20157/1/2015 PEND
DetailsAndy J. Long
Need to remove section of silt fence between Warm Springs Road and Walling Creek across from Starview.
General Inspection6/16/20156/16/20156/16/2015 PEND
DetailsEvan Jenkins
General Inspection6/1/20156/1/20156/1/2015 CANC
DetailsEvan Jenkins
General Inspection5/15/20155/15/20155/15/2015 PASS
DetailsAndy J. Long
General Inspection4/30/20154/30/20154/30/2015 PASS
DetailsAndy J. Long
General Inspection4/15/20154/15/20154/15/2015 PASS
DetailsEvan Jenkins
No Activity
Silt Fence still installed
no other ESC issues at this time
General Inspection3/27/20153/27/20153/27/2015 PASS
DetailsAndy J. Long
Aging Inspection3/10/20153/10/20153/10/2015 PEND
DetailsAndy J. Long
No changes or activity at site since prior inspection. Need to check with Syman Company and Knife River to see if the silt fence BMP is remaining installed for future work.

No violations or stormwater pollution sources at site.
Random Inspection1/6/20151/6/20151/6/2015PPASS
DetailsAndy J. Long
Consruction is complete. Silt fence BMP is still installed and may be in place for future work - if not I will have the BMP removed at next inspection. No erosion or sediment movement from site observed.
Random Inspection10/8/201410/8/201410/8/2014PPART
DetailsAndy J. Long
Silt fence and sediment containment at east end of sewer pressure line project has not been disturbed and is preventing sediment runoff. Warm Springs is still closed to traffic, and work is mostly confined to the ACHD right-a-way.

They have not yet begun activity in the environmentally sensitve area by the west end of MA Williams park and Walling Creek/Greenbelt corridor.

Correction:

Need to sweep up the east access point as part of housekeeping BMP. Significant amount of loose sediment on roadway.
Site Preparation9/15/20149/15/20149/15/2014PPASS
DetailsAndy J. Long
site prep for sewer line project a long Greenbelt and Warm Springs....

Most project is on the roadway. At confluence of Parkcent and Warm Springs, silt fence and a series or wattles have been installed properly.

Will continue to monitor as they get closer to the east end of project. Approved.