General Inspection | 9/16/2015 | 9/16/2015 | 9/16/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 9/16/2015 | 9/16/2015 | 9/16/2015 | P | PASS |
Evan Jenkins
|
|
|
Silt fence has been removed. ESC conditions satisfied
|
General Inspection | 9/1/2015 | 9/1/2015 | 9/1/2015 | | PEND |
Andy J. Long
|
|
|
Silt fence still installed. Sent reminder email to KR about requirement to remove silt fence. No erosion or sediment runoff occuring, just need to remove the temporary BMP.
|
General Inspection | 8/17/2015 | 8/17/2015 | 8/17/2015 | | PEND |
Andy J. Long
|
|
|
Knife River still required to remove silt fence. Ground is stabilized & no construction activity. KR stated they would remove it.
|
General Inspection | 7/31/2015 | 7/31/2015 | 7/31/2015 | | FAIL |
Andy J. Long
|
|
|
Need to remove temp BMP silt fence. Project has been complete for long time and silt fence is no longer needed and is starting to degrade and tatter.
Called Mike Cole with Knife River to remove silt fence. Syman installed but stated KR was to remove fence.
|
General Inspection | 7/16/2015 | 7/16/2015 | 7/16/2015 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/1/2015 | 7/1/2015 | 7/1/2015 | | PEND |
Andy J. Long
|
|
|
Need to remove section of silt fence between Warm Springs Road and Walling Creek across from Starview.
|
General Inspection | 6/16/2015 | 6/16/2015 | 6/16/2015 | | PEND |
Evan Jenkins
|
|
|
|
General Inspection | 6/1/2015 | 6/1/2015 | 6/1/2015 | | CANC |
Evan Jenkins
|
|
|
|
General Inspection | 5/15/2015 | 5/15/2015 | 5/15/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/30/2015 | 4/30/2015 | 4/30/2015 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 4/15/2015 | 4/15/2015 | 4/15/2015 | | PASS |
Evan Jenkins
|
|
|
No Activity Silt Fence still installed no other ESC issues at this time
|
General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 3/10/2015 | 3/10/2015 | 3/10/2015 | | PEND |
Andy J. Long
|
|
|
No changes or activity at site since prior inspection. Need to check with Syman Company and Knife River to see if the silt fence BMP is remaining installed for future work.
No violations or stormwater pollution sources at site.
|
Random Inspection | 1/6/2015 | 1/6/2015 | 1/6/2015 | P | PASS |
Andy J. Long
|
|
|
Consruction is complete. Silt fence BMP is still installed and may be in place for future work - if not I will have the BMP removed at next inspection. No erosion or sediment movement from site observed.
|
Random Inspection | 10/8/2014 | 10/8/2014 | 10/8/2014 | P | PART |
Andy J. Long
|
|
|
Silt fence and sediment containment at east end of sewer pressure line project has not been disturbed and is preventing sediment runoff. Warm Springs is still closed to traffic, and work is mostly confined to the ACHD right-a-way.
They have not yet begun activity in the environmentally sensitve area by the west end of MA Williams park and Walling Creek/Greenbelt corridor.
Correction:
Need to sweep up the east access point as part of housekeeping BMP. Significant amount of loose sediment on roadway.
|
Site Preparation | 9/15/2014 | 9/15/2014 | 9/15/2014 | P | PASS |
Andy J. Long
|
|
|
site prep for sewer line project a long Greenbelt and Warm Springs....
Most project is on the roadway. At confluence of Parkcent and Warm Springs, silt fence and a series or wattles have been installed properly.
Will continue to monitor as they get closer to the east end of project. Approved.
|