Aging Inspection | 5/26/2015 | 5/26/2015 | 5/26/2015 | | PASS |
Evan Jenkins
|
|
|
|
DOC - Permit Finaled | 5/26/2015 | 5/26/2015 | 5/26/2015 | P | PASS |
Evan Jenkins
|
|
|
project complete no esc issues
|
Aging Inspection | 3/25/2015 | 3/25/2015 | 3/25/2015 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 1/23/2015 | 1/23/2015 | 1/23/2015 | P | PASS |
Andy J. Long
|
|
|
WIP. BMPs installed. No trackout, material spills, or discharges. No corrections required.
|
Site Preparation | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Andy J. Long
|
|
|
Pre-dig erosion conference. Phone #: ###-#### Inspection requested via web by Lucas Christian
Inspection already conducted this morning. Called Luke to confirm and discuss project. Excavation will begin this afternoon. Wattles will be removed and reinstalled after excavation to prevent damage.
|
Site Preparation | 9/30/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Andy J. Long
|
|
|
Steve Phone #: ###-####
Permit posted, silt fence installed on both sides of house to prevent disturbance and dirt from exiting site. Gatorguard wattles installed along the alley and 26th Street. Site is approved for excavation.
|