Aging Inspection | 1/11/2016 | 1/11/2016 | 1/11/2016 | | PASS |
Andy J. Long
|
|
|
Runway paving project complete and grading permit finaled. No trackout issues observed around airport perimeter. ESC permit finaled.
|
DOC - Permit Finaled | 1/11/2016 | 1/11/2016 | 1/11/2016 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 11/9/2015 | 11/9/2015 | 11/9/2015 | | CANC |
Evan Jenkins
|
|
|
|
Aging Inspection | 9/7/2015 | 9/7/2015 | 9/8/2015 | | PASS |
Andy J. Long
|
|
|
WIP. No sediment runoff or fugitive dust leaving construction area within secured airport runway area.
|
General Inspection | 7/6/2015 | 7/6/2015 | 7/6/2015 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 5/6/2015 | 5/6/2015 | 5/6/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC issues at this time
|
Aging Inspection | 3/6/2015 | 3/6/2015 | 3/6/2015 | | PASS |
Andy J. Long
|
|
|
Some activity on runways occuring on south side of airport area. No trackout, dust, or offsite stockpiles in use. Site is self contained and in restricted area. No corrections.
|
Site Preparation | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Andy J. Long
|
|
|
Jeff Phone #: ###-####
Runway realignment project by Central Paving. Site is within restricted zone. Discussed ESC conditions and BMPs for site with Jeff. He stated inlets are in place, water supression for dust, and control trackout as necessary. Flat area, no surface water.
ESC fees paid. Approved.
|