General Inspection | 7/26/2016 | 7/26/2016 | 7/26/2016 | | PASS |
Andy J. Long
|
|
|
Construction on first phase complete, BLD finaled. Yard and hillside outside of fenced home are adequately vegetated/stabilized. PW hillside bond has been issued. Homeowner to remove silt fence around fence at own discretion, interior yard is mostly gravel driveway.
|
DOC - Permit Finaled | 7/26/2016 | 7/26/2016 | 7/26/2016 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/11/2016 | 7/11/2016 | 7/11/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/24/2016 | 6/24/2016 | 6/24/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/9/2016 | 6/9/2016 | 6/9/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/25/2016 | 5/25/2016 | 5/25/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 5/10/2016 | 5/10/2016 | 5/10/2016 | | PEND |
Evan Jenkins
|
|
|
BLD finaled. Disturbed areas need re-vegetated. No discharges leaving site at time of inspection
|
General Inspection | 4/25/2016 | 4/25/2016 | 4/25/2016 | | PASS |
Evan Jenkins
|
|
|
|
General Inspection | 4/8/2016 | 4/8/2016 | 4/8/2016 | | PASS |
Andy J. Long
|
|
|
WIP on interior and exterior finishes. Structure is framed and built out, no excavation occuring. No trackout or discharges; permit posted inside fence.
|
General Inspection | 3/24/2016 | 3/24/2016 | 3/24/2016 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/9/2016 | 3/9/2016 | 3/9/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 2/8/2016 | 2/8/2016 | 2/8/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/22/2016 | 1/22/2016 | 1/22/2016 | | PASS |
Andy J. Long
|
|
|
|
Tracking Control | 1/7/2016 | 1/7/2016 | 1/11/2016 | P | CANC |
Andy J. Long
|
|
|
Rob Phone #: ###-####
|
General Inspection | 1/4/2016 | 1/4/2016 | 1/4/2016 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2015 | 12/18/2015 | 12/18/2015 | A | PASS |
Andy J. Long
|
|
|
No trackout from site due to rock entrance, permit sign posted, and clearing limits are well observed. Additional wattles were installed to treat/slow runoff from within site to the left of the access drive as requested during site prep. No corrections at this time. WIP.
|
Site Preparation | 12/17/2015 | 12/18/2015 | 12/17/2015 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/17/2015 | 12/17/2015 | 12/17/2015 | | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 12/1/2015 | 12/2/2015 | 12/2/2015 | A | PASS |
Andy J. Long
|
|
|
Rob Phone #: ###-####
ESC permit sign posted inside gate. Existing rock entrance installed from previous gradiing/landscaping work in 2013-14. Bottom of site has vegetated berm. Silt fence installed on other side is not trenched in and is intended to be a wind barrier and trash capture. GC-RP will install J hook wattle to left of entrance.
Approved for construction. Informed Rob about new Boise City Green Ordinance for future projects.
|
Site Preparation | 11/25/2015 | 12/1/2015 | 12/1/2015 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/25/2015 | 11/25/2015 | 11/25/2015 | | PASS |
Andy J. Long
|
|
|
Permit just issued. No activity occuring at site yet...will check back for site prep next week.
|