Site Final | 10/3/2016 | 10/3/2016 | 10/3/2016 | A | PASS |
Andy J. Long
|
|
|
Exterior of BSU Alumni buiding is complete. Some interior work and approvals are pending. BLD open.
Site is landscaped, parking lot and permanent storm water system (permeable pavers) are installed. No loose dirt, debris, or other construction materials remaining on site. No sediment filter bags remain. DI on Denver and University is still appears to have drainage issues. New DI on Belmnt has had temp BMP removed. No further ESC corrections or requests. ESC permit conditions satisfied.
|
General Inspection | 10/3/2016 | 10/3/2016 | 10/3/2016 | | PASS |
Andy J. Long
|
|
|
see Site Final inspection...
|
General Inspection | 8/18/2016 | 8/18/2016 | 8/18/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/5/2016 | 8/5/2016 | 8/5/2016 | | PASS |
Evan Jenkins
|
|
|
no esc issues observed
|
General Inspection | 6/20/2016 | 6/20/2016 | 6/20/2016 | | PASS |
Evan Jenkins
|
|
|
WIP: no esc issues observed at this time
|
General Inspection | 4/29/2016 | 5/4/2016 | 5/4/2016 | A | PART |
Andy J. Long
|
|
|
Frame of building is complete, interior and exterior finishes in progress. Parking area and site improvements have not yet started and open areas being utilized for staging.
Lined concrete/liquid waste washout pit provied, designated construction entrance, and storm drain inlet sediment protection is installed.
Corrections needed:
- sweep Belmont street and gutters along project - conduct maintenance on the DI bag adjacent to construction entrance.
|
General Inspection | 4/29/2016 | 4/29/2016 | 4/29/2016 | | CANC |
Andy J. Long
|
|
|
rescheduled for 5/4
|
General Inspection | 3/14/2016 | 3/14/2016 | 3/17/2016 | | PASS |
Evan Jenkins
|
|
|
WIP
|
General Inspection | 1/26/2016 | 1/26/2016 | 1/26/2016 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress. Site perimeter is free of loose sediment and construciton materials. Minimal earthwork at this time. No corrections issued. Approved.
|
General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 | | PASS |
Evan Jenkins
|
|
|
WIP: No ESC Issues Observed at this time
|
General Inspection | 10/26/2015 | 10/26/2015 | 10/26/2015 | P | PASS |
Andy J. Long
|
|
|
BMPs at BSU Alumni Center are working well to contain sediment on site. Construction entrance is installed and access to site is controled. Curbing contains project and DIs in area have sediment bags. No corrections requested.
|
General Inspection | 10/1/2015 | 10/1/2015 | 10/1/2015 | P | PASS |
Andy J. Long
|
|
|
WIP on structural beams. Site perimeter has curbing and some silt fencing around a stockpile area. Permit sign posted at construction entrance, no trackout, discharges, fugitive dust, or other violations observed. Approved.
|
Random Inspection | 9/11/2015 | 9/11/2015 | 9/11/2015 | P | PASS |
Andy J. Long
|
|
|
BSU Alumni Center is in progress with steel structural beams being erected. The curbing and sidewalk has remained in tact and was improved in some areas making a structural sediment barrier. Sidewalk and gutter are free of loose sediment from site.
Site has chain link fencing and a designated construction entrance with tracking rock. No trackout. Permit sign posted at entrance.
Sprinklers being used on stockpiles around site to control fugitve dust.
No corrections, approved. Well managed site.
|
General Inspection | 8/7/2015 | 8/7/2015 | 8/7/2015 | | PASS |
Andy J. Long
|
|
|
Vertical construction in progress within secure and contained site. Perimeter wattles and curbing provide sediment containment in case of storm. No trackout, streets and gutters around site are in good condition, no discharges or trackout.
|
General Inspection | 6/22/2015 | 6/22/2015 | 6/22/2015 | | PASS |
Andy J. Long
|
|
|
BSU alumni center foundation is in progress as well as removal and replacemt of road shoulders, curb, and gutters. No fugitve dust, trackout or disharges observed. Permit sign posted. Approved.
|
General Inspection | 5/5/2015 | 5/5/2015 | 5/5/2015 | | PASS |
Andy J. Long
|
|
|
Vegetative perimeter from previous landscaping has been preserved on east side of project. Inlets around site have protection, construction entrance is installed, and permit posted.
No fugitive dust, discharges, or other issues observed. No corrections needed. WIP
|
Site Preparation | 3/18/2015 | 3/18/2015 | 3/18/2015 | P | NR |
Andy J. Long
|
|
|
No grading or excavation has commenced for new alumni center. Old building already demolished and materials removed.
Only MS4 is on University and Denver and appearss to be clogged (full of water). May need to consider alternative sediment control.
No site prep requested, checking to see work hadn't already started without inpsection.
|