Site Final | 6/25/2015 | 6/25/2015 | 6/25/2015 | P | PASS |
Andy J. Long
|
|
|
Parking lot and site improvement project is complete. Area between project and Gowen Road has been stabilized with tacifier and mulch. Wattles will remain on site till full revegetation. No further ESC inspections needed, site in very good condition.
|
General Inspection | 5/12/2015 | 5/12/2015 | 5/12/2015 | | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 3/24/2015 | 3/24/2015 | 3/24/2015 | A | PASS |
Andy J. Long
|
|
|
Work on new parking lot has resumed. Perimeter wattles, construction entrance and permit are onsite. No discharges or trackout to Gowen or Supply. No corrections needed.
|
Random Inspection | 12/1/2014 | 12/1/2014 | 12/1/2014 | P | PASS |
Andy J. Long
|
|
|
Western Trailer parking lot has had initial grading and site work completed. Talked to the project manager for Western Trailer and he informed me the project is currently shut down for winter and will resume once conditions improve for asphalt and cement work.
Permit posted, site surrounded by trenched in perimeter wattles. No trackout or other ESC issues/discharges. Approved.
|