Site Final | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | DONE |
Phil Shearer
|
|
|
|
DOC - Permit Finaled | 5/18/2015 | 5/18/2015 | 5/18/2015 | P | PASS |
Phil Shearer
|
|
|
|
BMP Violation | 4/8/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Andy J. Long
|
|
|
Check that washout was cleaned. Zach Evans site supervisor called to say that clean up would occur wednesday & thursday.
Illicit washout pile has been cleaned up and sidewalk swept. Site is now back in compliance.
Discussed provided lined washout or Ecopan for remaining Z. Evans projects in Antelope Springs.
|
Aging Inspection | 4/8/2015 | 4/8/2015 | 4/8/2015 | | FAIL |
Andy J. Long
|
|
|
Corrections:
1. No concrete washout used. Need to clean up concrete waste. Dave Evans construction sites will be monitored closely for non-compliant washouts. 2. Sweep sidewalks and gutter in culdesac.
Verbal correction left on RP Dave. Bashista's voicemail. Will check back.
|
BMP Violation | 1/8/2015 | 1/13/2015 | 1/13/2015 | A | PART |
Andy J. Long
|
|
|
dirty antelope springs home
Loose dirt and mud clods in culdesac have been cleaned and no new trackout.
Correction incomplete:
Need to clean up/contain wood scraps
|
BMP Violation | 1/8/2015 | 1/8/2015 | 1/8/2015 | P | FAIL |
Andy J. Long
|
|
|
Corrections needed:
Clean up uncontained scrap wood. Sweep sidewalks and gutters. Coordinate with development to sweep Parsnip Peak.
Conditions not good for clean up activities, so will re-inspect next week for corrections.
|
Site Preparation | 10/30/2014 | 10/31/2014 | 10/31/2014 | P | PASS |
Evan Jenkins
|
|
|
Adam Phone #: ###-####
|