Permit NumberESC14-00982
StatusFinaled
Name PAT PALMER
Site Address 6017 W OPOHONGA ST
Project NamePalisades Apartments
Customer Number 
ePlanReviewNo
Description
A: 47 unit multi-family apartment project with two three-story buildings, mechanical, electrical, plumbing and related site work.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/13/20169/16/20169/16/2016APASS
DetailsAndy J. Long
Follow up inspection on DI clean up and inlet bag removal

Gutter was swept. Leaves and dirt around drop inlet were cleaned and the temp. BMP DI bag has been removed as requested. East building exterior and landscaping is complete. ESC permit conditions satisfied. Remaining work covered under ESC14-00983
DOC - Permit Finaled9/16/20169/16/20169/16/2016PPASS
DetailsAndy J. Long
General Inspection9/13/20169/13/20169/13/2016 PART
DetailsAndy J. Long
East building is partially complete with some units already occupied. West building is framed and has exterior and interior finishes remaining.

No trackout or discharges, but need to do housekeeping & maintenance:
1. Clean out dirt around MS4 on Opohonga and remove inlet bag since parking lot and landscaping is installed.
2. Empty west trash container.

Verbal correction to Biltmore RP
General Inspection7/29/20167/29/20167/29/2016 PASS
DetailsEvan Jenkins
work is in progress. BMP's in good shape, no maintenance needed at this time. Trash/debris is contained in trash bins.
General Inspection6/13/20166/13/20166/13/2016 PASS
DetailsAndy J. Long
WIP. MS4 inlet on street has sediment filter bag. Site trash and materials are contained.
Random Inspection4/27/20164/27/20164/27/2016PPART
DetailsMike Jordan
Needs to sweep silts from hard surfaces.
General Inspection4/26/20164/26/20164/26/2016 PASS
DetailsAndy J. Long
Apartments nearly framed. Parking lot paved for employee parking and unloading. No trackout. MS4 has sediment protection. Approved.
General Inspection3/11/20163/11/20163/11/2016 DONE
DetailsTroy James
NO ESC violations noted
General Inspection1/25/20161/25/20161/25/2016 PASS
DetailsAndy J. Long
BMP Violation12/3/201512/8/201512/8/2015PPART
DetailsAndy J. Long
Corrections completed:

-Street was swept to clear original trackout/sediment runoff.
- Storm drain inlet fitted with sediment filter bag


Corrections remaining:
- post yellow ESC sign with contact information
- street will neede more sweeping once utility trench is paved
Tracking Control12/2/201512/3/201512/3/2015APEND
DetailsAndy J. Long
No activity, trenching and paving still on hold due to weather. Road is still dirty but stormwater infrastructure is not complete.

Verbal CN to Biltmore Co. to sweep up street and gutter to east of site, install DI bag on new inlet, and post ESC permit sign.
Tracking Control11/30/201512/2/201512/2/2015ACANC
DetailsAndy J. Long
rescheduled for 12/3..
General Inspection11/30/201511/30/201511/30/2015 FAIL
DetailsAndy J. Long
Curb work suspended due to freezing temperature and inability to pour concrete. Significant amount of loose sediment and sand has been left in roadway. No construction entrance provided. No activity at time of inspection. No discharge or polluted storm water flows.

Correction request to Biltmore Company request to sweep up roadway with sweeper when curbing is complete and to manual sweep in front of site prior to curb completion.
General Inspection10/13/201510/13/201510/13/2015 PASS
DetailsEvan Jenkins